Similar Projects
Project Silver
New Construction, Infrastructure
Conception
Douglasville, GA

SR 8 From Carroll County Line to CS 1306 / Bright Star Road
Infrastructure
Design
$3,000,000 est. value
Douglasville, GA 30134

West Pines Maintenance Facility Renovation
Demolition, New Construction, Infrastructure
Bidding
$800,000 CJ est. value
Douglasville, GA 30134

Cool Water Drive Stormwater Improvement Project
Infrastructure
Bidding
$600,000 CJ est. value
Douglasville, GA 30135

Administrative Building Addition
Addition, Demolition, Infrastructure, Renovation - 16,000 SF
Post-Bid
$300,000 CJ est. value
Douglasville, GA 30134

Administrative Building Addition
Addition, Demolition, Infrastructure, Renovation - 16,000 SF
Post-Bid
$300,000 CJ est. value
Douglasville, GA 30134

2021 LMIG Project
Results
Mount Vernon, GA

Lee Road/Sr1161/Cr 817 Widening and Reconstruction
Infrastructure
Results
Douglasville, GA 30122

Oakmont Skyview Drive Warehouse
New Construction, Infrastructure - 181,430 SF
Pending Verification
$20,000,000 CJ est. value
Lithia Springs, GA 30122

Oakmont Skyview Drive Warehouse
New Construction, Infrastructure - 181,430 SF
Pending Verification
$20,000,000 CJ est. value
Lithia Springs, GA 30122

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Douglasville ADA Connection
Infrastructure
Results
Douglasville, GA 30135

Highway 92 Multi-Residential Development
New Construction, Infrastructure - 7,000 SF
Pending Verification
$10,000,000 CJ est. value
Douglasville, GA 30135

Stewart Mill Road at Reynolds Road Improvement Project
Infrastructure
Post-Bid
$1,300,000 CJ est. value
Douglasville, GA 30135

6.860 Miles of Milling, Inlay and Plant Mix Resurfacing on SR 5 Beginning at Connally Rd (CS 591) and Extending to the Cobb County Line
Infrastructure
Results
Douglasville, GA 30134

Last Updated 09/06/2022 12:35 PM
Project Title

Highway 5 Gas Station

Physical Address View project details and contacts
City, State (County) Douglasville, GA 30135   (Douglas County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 6, 2022, no building permits have been submitted to the City of Douglasville. Information regarding an architect or general contractor has not been disclosed. Construction is expected to begin in fourth quarter 2022.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents