Similar Projects
Straits Fishing Pier Replacement
Post-Bid
Beaufort, NC 28516

Cedar Island Dock Repairs
Post-Bid
Cedar Island, NC 28516

Repairs to North Topsail Beach Access Sites #1, #2
Results
Less than $99,744 est. value
North Topsail Beach, NC

Fonta Flora State Trail - Linville Access Boardwalk
Results
NC

Provide Shoring Systems Columns
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Demolition and Replacement of the Park Street Pier - Hurricane Florence Damages
Results
Emerald Isle, NC

Major M & R of Concrete Wharf at USCG SFO Fort Macon, Atlantic Beach, NC
Post-Bid
$1,000,000 to $5,000,000 est. value
Atlantic Beach, NC 28512

Demolition and Replacement of the EI Woods Pier - Hurricane Florence Damages
Results
Emerald Isle, NC

New River Waterfront Park Repairs
Post-Bid
Less than $500,000 est. value
Jacksonville, NC 28540

Demolition and Replacement of the Cedar Street Pier - Hurricane Florence Damages
Results
Emerald Isle, NC

Repair Multiple Docks
Post-Bid
$100,000 to $250,000 est. value
Cherry Point, NC

Repairs to North Topsail Beach Access Site #4
Results
North Topsail Beach, NC

Dowdy Park Phase III
Post-Bid
Nags Head, NC

Dolphin Piling Repair at Elizabeth II for Roanoke Island Festival Park
Results
Less than $22,000 est. value
Manteo, NC 27954

FY 20/21 Capital Improvement Project Admiral Street Public Beach Access
Post-Bid
Nags Head, NC

Last Updated 04/28/2020 09:23 AM
Project Title

Lawson Creek Boardwalk Replacement Project

Physical Address View project details and contacts
City, State (County) New Bern, NC 28563   (Craven County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Boardwalk at Lawson Creek Park and a portion of the shelter was destroyed during Hurricane Florence. This project includes rebuilding the boardwalk to specifications listed below and within the attached drawings. The project will also include replacing deck boards,handrails and handrail posts on the shelter structure at the end of the boardwalk. Handrail profile on shelter structure is the same as on the boardwalk. The boardwalk is 6’ wide and approximately 400’ long. The existing pilings are intact and use able for the rebuild. The Shelter structure is approximately 20’x20' Completed submittal must be marked on the outside: RFB (20-018) Lawson Creek Boardwalk Replacement Attention: Foster Hughes New Bern Parks & Recreation 1307 Country Club Road New Bern, NC 28563

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents