Similar Projects
Meskwaki Training Center
New Construction
Conception
Tama, IA

Water Administration Building HVAC Improvements - 6250105 - City of Cedar Rapids
Renovation
Conception
$1,600,000 est. value
Cedar Rapids, IA 52402

Pavilion Railing Replacement
Infrastructure
Design
$249,500 CJ est. value
Council Bluffs, IA 51501

City Proactively Replacing Meter Interface Units
Renovation
Design
$100,000 CJ est. value
Dubuque, IA 52001

Motor Mill Inn Renovation
Renovation
Bidding
$475,000 CJ est. value
Elkader, IA 52043

SWIPCO Main Office Addition / Remodel
Addition, Demolition, Build-out, Infrastructure
Bidding
$1,213,000 CJ est. value
Atlantic, IA 50022

Iowa DAS - Window Replacement
Renovation
Sub-Bidding
$250,000 CJ est. value
Newton, IA 50208

Cleaning Services at the Dubuque, IA Drivers License Station
Term Contract
Sub-Bidding
Dubuque, IA 52003

Asbestos Abatement
Term Contract - 24,000 SF
Post-Bid
Orange City, IA 51041

Multiple-Award Indefinite Delivery/Indefinite Quantity (IDIQ) Contract(s) for General Construction with Design/Build Capabilities
New Construction
Post-Bid
Less than $500,000,000 est. value

Emeis Maintenance Facility
New Construction
Results
Davenport, IA 52806

State of Iowa Capitol Small Domes
Renovation
Results
Des Moines, IA

Cedar Rapids Homeless Housing and Job Center
New Construction
Construction
$3,420,000 est. value
Cedar Rapids, IA 52405

Technical Services Complex Addition - City of Ames
Renovation
Conception
$2,579,000 est. value
Ames, IA 50010

RFP - Zero Emission Transition Plan for Fleet
Term Contract
Bidding
Cedar Rapids, IA 52401

Last Updated 08/04/2022 11:01 AM
Project Title

UV Disinfection Improvements

Physical Address View project details and contacts
City, State (County) Victor, IA 52347   (Iowa County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,494,078 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing a 442 SF concrete tank for an effluent UV and re-aeration system, 10-ft diameter effluent pump station, 384 SF pre-engineered wood post frame building, and influent flow metering provisions. In addition, the project includes site work, including grading, gravel drive restoration, seeding, and site piping, electrical and mechanical work, and other items or work shown on drawings. Work under the proposed Contract Documents shall be commenced upon written Notice to Proceed to be issued on or before July 11, 2022, work shall be substantially complete on or before May 31, 2023, and shall be fully completed and ready for operation on or before June 30, 2023, subject to any extension of time, which may be granted by the Owner.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents