Similar Projects
Building 2 Seismic Upgrades - 2020 Bond - Lane Community College
Renovation
Conception
$5,000,000 est. value
Eugene, OR 97401

Knight Campus Servery Project
Renovation
Bidding
$650,000 CJ est. value
Eugene, OR 97403

Knight Campus for the Acceleration of Scientific Impact (KCASI) Phase 2 - Bid Package: #3.2 -Steel
New Construction, Infrastructure
Sub-Bidding
$20,000,000 CJ est. value
Eugene, OR 97403

Demolition, Framing, Insulation and Seismic Work
Renovation - 58,551 SF
Post-Bid
Florence, OR 97439

Huestis Hall Deferred Maintenance Project - Bid Package 4
Renovation
Post-Bid
Eugene, OR 97401

Northwest Christian University Office Tower
Demolition, New Construction, Infrastructure - 73,000 SF
Pending Verification
$24,000,000 CJ est. value
Eugene, OR 97401

Lane Community College Florence Major Maintenance Project - Bid Package #3
Renovation - 15,905 SF
Post-Bid
$7,000,000 est. value
Florence, OR 97439

RFP Construction Manager - Construction Manager/General Contractor (CM/GC) for Heritage Renovation Project
Addition, Demolition, LEED Certification, Renovation, Infrastructure
Post-Bid
$79,550,000 CJ est. value
Eugene, OR 97401

Lane Community College - New Health Professions Building - BP 02
New Construction - 34,700 SF
Post-Bid
$17,000,000 est. value
Eugene, OR 97405

Building 16 - Science Lab Upgrades and Major Maintenance - 2020 Bond - Lane Community College
Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Eugene, OR 97405

LCC(Lane Community College) ITEC Building, - Mechanical/Plumbing, Electrical (Line and Low Voltage), Fire Suppression and Structural Steel Subcontractors
Renovation, Infrastructure
Post-Bid
$430,000 CJ est. value
Eugene, OR 97405

Hamilton Walton Residence Hall Transformation Project - Phase 2
Term Contract, Demolition, Infrastructure
Post-Bid
$792,000 CJ est. value
Eugene, OR 97401

Phil and Penny Knight Campus for Accelerating Scientific Impact - Phase 2
New Construction, Infrastructure
Post-Bid
$225,000,000 CJ est. value
Eugene, OR 97401

RFQ Design - Events and Learning Building and Clinical Research Building; Including the Ballmer Institute for Children's Behavioral Health
Renovation
Post-Bid
$9,200,000 CJ est. value
Eugene, OR 97401

UO Hamilton Walton Transformation Project Phase 3 - BP 7
Demolition, Renovation, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Eugene, OR 97403

Last Updated 07/25/2023 12:51 PM
Project Title

UO - KCASI AWN Replacement

Physical Address View project details and contacts
City, State (County) Eugene, OR 97403   (Lane County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $782,668 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of existing lab batch acid waste neutralization (AWN) system with a owner purchased continuous-process 10gpm system from Wastech. System will have lift stations to convey waste generated in the clean room lab area and mechanical room to the AWN. It will be the responsibility of each participating Vendor to refer daily to the UO Business Opportunities website to check for any available opportunities, addendum to current opportunities, cancellations, or intents to award posted there. It is not UO's responsibility to notify participating Vendors by email or by any other means of any of the above. Direct to consultant/copy owner representative (rcastor@iesengineering.net) (brennan@uoregon.edu)

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents