Similar Projects
Wildflower Ranch
New Construction
Design
Fort Worth, TX 76262

Moderno
New Construction
Design
Kennedale, TX 76060

IH 35W - Winter Weather Material
Term Contract
Sub-Bidding
$953,520 CJ est. value
Fort Worth, TX 76102

Furnish and Deliver Pipeline Chemicals
Term Contract
Sub-Bidding
Fort Worth, TX 76102

Housing Rehabilitation
Renovation
Post-Bid
Forest Hill, TX

Ground-Based Mosquito Control and Surveillance Activities
Post-Bid
TX

Grease Trap Services
Results

Reverse Osmosis and De-Ionized Water
Term Contract
Results
Arlington, TX

Oxford Place
New Construction
Construction
Southlake, TX 76092

Silver Oak
New Construction
Construction
Mansfield, TX 76063

Draft: Bardwell Lake Park Cleaning Services
Term Contract
Design
$500,000 to $1,000,000 est. value

Pest Control Services
Post-Bid
Mansfield, TX

Weekly Pool Cleaning Services
Term Contract
Results
Arlington, TX 76013

Elan Keller Center Stage
New Construction
Construction
Keller, TX 76248

Unrestricted Vertical MATOC
Term Contract
Design
Fort Worth, TX

Last Updated 07/22/2022 10:06 AM
Project Title

Lead Risk Assessment

Physical Address View project details and contacts
City, State (County) Haltom City, TX 76117   (Tarrant County)
Category(s) Residential, Single Trades
Sub-Category(s) Service/Term Contracts, Single-Family Homes
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All applicable references to Basic General Specifications are incorporated into this document. Specific Specifications are provided for items not covered in the Basic General Specifications. Contractor will furnish labor, materials, tools, machinery, and supervision necessary to perform the specified work required in connection with his bid. Implied work, work specified and not shown on drawing or drawn and not specified will be executed as if fully described in both ways; and any work or materials which are not directly noted in the specifications or drawings but are necessary for the performance of the obvious intentions thereof are to be understood as implied work and will be provided for by the contractor in his proposal as fully as if specifically described or drawn. Install new three-wire, grounded 200-amp service with main breakers. Label all breakers. Service must comply with utility company requirements. (Homeowner is responsible for disconnect and reconnect fees) Install 110V duplex outlet in hallway. Install GFCI protected 110V duplex outlet with weatherproof cover at new panel. Install new GFCI protected 110V duplex outlet. Located left of stove on the kitchen counter. Install new GFCI protected 110V duplex outlet under kitchen sink. Install new GFCI protected 110V duplex outlets on garage wall. Install new GFCI protected 110V duplex outlets on garage ceiling. Install box cover on exposed wiring by garage door. Install a dedicated 20amp 110V circuit complete with new breaker, wiring, electrical box, outlet and cover for freezer in bedroom 3. Install new GFCI protected 110V duplex outlet for utility room.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents