Similar Projects
MJ Taylor Road Rehabilitation/Resurfacing
Infrastructure
Bidding
$260,000 CJ est. value
Adel, GA 31620

MJ Taylor Road Rehabilitation/Resurfacing
Infrastructure
Bidding
$260,000 CJ est. value
Adel, GA 31620

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Resurfacing and Shoulder Rehabilitation on Valdel Road
Infrastructure
Results
$2,000,000 est. value
Adel, GA 31620

Street Paving and Flood & Drainage Project
Infrastructure
Results
$968,182 CJ est. value
Adel, GA 31620

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

Streets and Drainage Improvements Revels Avenue and Taylor Street- TIA
Infrastructure
Results
$217,868 CJ est. value
Lenox, GA 31637

Emergency Services Radio System Improvements
Infrastructure
Post-Bid
$100,000 CJ est. value
Adel, GA 31620

Georgia Transportation Infrastructure Bank (Gtib) Project Leveling and Resurfacing Improvements to Brushy Creek Road
Infrastructure
Results
$293,492 CJ est. value
Sparks, GA 31647

Last Updated 04/17/2023 01:34 PM
Project Title

Alabama Road Construction Project

Physical Address View project details and contacts
City, State (County) Adel, GA 31620   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project will realign +/-1.5 miles of Alabama Rd. and connected roadway intersections to provide a direct alignment between SR 37 and SR 76 west of I-75 with a mainline alignment of +/-1.28 miles. The project includes grading complete, traffic control, +/-12,600 TN of asphalt paving with associated graded aggregate base, +/- 3,670 LF of 30" concrete curb and gutter, sidewalk, guardrail, striping, water sewer utility relocation, erosion & sediment control, and other associated improvements. The project is located in the TIA Southern Georgia Region and will be locally Let by the City of Adel (PI 0016253). Time allotted for completion of work is 300 consecutive calendar days to substantial completion. Work shall be complete and ready for contract closeout within 330 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State Law Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Owner reserves the right to waive informalities, and to re-advertise. All bid forms must be accompanied by a Bid Bond in an amount not less than five percent (5%) of the amount bid. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond in the amount of one hundred percent (100%) and a Payment Bond in the amount of one hundred ten percent (110%) of the Contract amount. All bonds must appear on the Treasury Department's most current Circular 570 Listing. contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Prequalification may be required of Bidders prior to the award of contract. At the Owner's request, detailed written evidence such as financial data, bonding capacity, previous experience, present commitments, and other such data as may be necessary to assist Owner in determining Contractor's qualifications shall be provided per the Instructions to Bidders contained in the contract documents

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents