Similar Projects
2021 La Salle and Third Street Improvements
Infrastructure
Post-Bid
Rewey, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

STH 11 - Mineral Point, County Shop Road - Minvera Street, STH 11 - Mineral Point, County Shop Road - Minvera Street
Results
Mineral Point, WI 53565

Avoca - Richland Center, Wisconsin River Bridge to CTH RC
Results
Avoca, Richland Center, WI 53506

CTH T - CTH T, Mill Creek Bridge, B-25-0186
Results
WI

Leffler Road, Bennett Road to CTH Z
Results
Dodgeville, WI 53533

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Avoca - Richland Center, STH 133 - West County Line; Muscoda - Lone Rock, STH 80 - STH 130
Results
Avoca, Lone Rock, Muscoda, Richland Center, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

2021 Town Road Improvement Discretionary - Keough Springs Road
Results
Linden, WI 53553

2021 Infrastructure Improvements
Results
Less than $1,250,000 est. value
Ridgeway, WI 53582

2021 Street Reconstruction
Results
Dodgeville, WI 53595

Dodgeville - Hollandale, Diamond Oaks Drive to CTH K
Infrastructure
Results
Dodgeville, WI 53595

County Highway Improvement CTH N (CTH NN – STH 133)
Infrastructure
Results
WI

CTH NN (CTH N - Cheese Factory) Chip 17123
Infrastructure
Results
WI

Last Updated 02/02/2022 04:14 PM
Project Title

Asphalt Maintenance Milling STH 23

Physical Address View project details and contacts
City, State (County) Dodgeville, WI   (Iowa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STH 23 from the Intersection near the Dodgeville Hospital southerly to the interchange project limits from the Dodgeville bypass concrete replacement project tie-in point from 2019. Mill approximately 1.5 inches of the existing asphalt pavement surfaces, and any incidental items necessary to complete the milling and paving project. Contractor shall provide all labor, equipment, and materials necessary for milling of 1.5 inches of the existing asphalt to recreate the cross sections and profile in preparation for an overlay wedge. County shall provide new asphaltic pavement surface materials, grade shaping, compaction, watering, and rolling materials back to a normal crown or existing cross slope for STH 23.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents