Similar Projects
Willmar City Hall
New Construction
Conception
Willmar, MN

City Hall - Mechanical Systems Upgrade - MBC02 - City of Minneapolis
Renovation
Conception
$4,354,500 CJ est. value
Minneapolis, MN 55415

Public Works Building Expansion
Renovation, Addition - 50,000 SF
Design
Otsego, MN 55330

City Hall Remodel Project - City of Detroit Lakes
New Construction
Design
$5,700,000 est. value
Detroit Lakes, MN

Owatonna City Hall Council Chamber Remodel
Build-out - 22,100 SF
Bidding
$500,000 CJ est. value
Owatonna, MN 55060

Stearns County Courthouse Masonry, Stone, and Terra Cotta Maintenance
Renovation
Bidding
$340,000 CJ est. value
Saint Cloud, MN 56303

Public Works Facility
New Construction - 60,000 SF
Post-Bid
$12,000,000 est. value
Orono, MN 55356

Township Hall & Maintenance Garage
New Construction
Post-Bid
Mankato, MN

City Hall Improvements
Build-Out
Results
$3,500,000 est. value
Blaine, MN 55449

Juvenile Justice Center (JJC) C203 Courtroom Remodeling
Renovation - 900 SF
Results
$2,644,710 est. value
Minneapolis, MN 55415

City Hall Ground, 3rd and 4th Floors
Renovation
Construction
Duluth, MN 55802

Courthouse Improvements
Renovation
Post-Bid
Blue Earth, MN

Judicial Center Lower Level Courts
Renovation
Results
$650,000 est. value
Hastings, MN 55033

South Saint Paul Phase 1 City Hall, Fire, Police Renovation
Renovation
Post-Bid
South Saint Paul, MN 55075

Olmsted County Justice Center Remodel - General Construction Package
Renovation
Results
Rochester, MN 55904

Last Updated 10/26/2022 11:03 AM
Project Title

City Hall MEP Renewal Construction

Physical Address View project details and contacts
City, State (County) Duluth, MN 55802   (Saint Louis County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,860,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of 07/28/2022 Construction is anticipated to start in September. Renovation of City Hall HVAC Systems and other impacted systems, including but not limited to ceilings, shafts, floor and wall openings, and electrical infrastructure. Bid surety in the amount of 5% of the total bid must be submitted with each bid. No alternatives to the specification will be considered unless specifically requested. Erasures or other changes to the bid must be initialed and dated, however no special conditions shall be made or included in the bid form by the bidder Please submit any questions regarding this project via e-mail to purchasing@duluthmn.gov. Responses will be issued as an addendum to this solicitation. Deadline to submit questions is June 23, 2022 at 2:00 PM central time. Answers issued June 27 in an addenedum. The City of Duluth reserves the right to split the award where there is a substantial savings to the City, to waive informalities and to reject any and all bids. Price may not be the only consideration for bid award. Bids must be firm for a minimum of 60 days. 1. Insurance - Contractor must provide proof of Public Liability and Automobile Liability Insurance with limits not less than $1,500,000 Single Limit prior to the commencement of work. The City of Duluth must be named as an additional insured. Please refer to the draft Contract, Section 8. 2. Performance & Payment Bonds - The awarded contractor will be required to submit performance and payments bonds in the full amount of the project cost prior to award. 3. Project Labor Agreement (PLA) - A PLA will be required for any award that is over or could virtually go over $150,000. A copy of the City standard PLA is included in this package. 4. Community Benefits Provisions - A Community Benefits Best Efforts Plan will be required for any project that includes a PLA. The required form is included in the bid package, as well as a link to additional community benefits information, including the program specifications and a process flowchart. 5. Out of State Contractor - Unless a State of Minnesota Certificate of Exemption is provided, any outof-state bidder receiving a bid award will have 8% retained from invoice payments on any contracts over $50,000. Submit a signed copy of the signed exemption form when submitting Payment and Performance Bonds. 6. Prevailing Wage - Not less than the minimum salaries and prevailing wages as set forth in the contract documents must be paid on this project. The City of Duluth is an Equal Opportunity Employer. Contractor shall comply with all applicable Equal Employment Opportunity laws and regulations. The Project consists of the renovation of City Hall HVAC Systems, and other systems impacted by the replacement of the HVAC system, including but not limited to ceilings, shafts, floor and wall openings, and electrical infrastructure.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents