Similar Projects
Pavement Pulverization, Processing Modified Soil, Application of A-3 Bituminous Surface Treatment and Aggregate Shoulders
Infrastructure
Bidding
$4,000,000 est. value
Algonquin, IL 60102

Reconstruct Souwanas Trail
Infrastructure
Bidding
$4,000,000 est. value
Algonquin, IL

2021 HMA Materials Only
Post-Bid
McHenry, IL

2021 Asphalt Purchase
Post-Bid
IL

2021 Parking Lot Replacements
Results
Lake in the Hills, IL

2021 Road Resurfacing Program
Results
Cary, IL

Amazon Distribution Center and Office Warehouse
New Construction - 673,186 SF
Construction
$100,000,000 est. value
Huntley, IL 60142

Picnic Grove Park Bike Path
Infrastructure
Bidding
$121,000 est. value
Fox River Grove, IL 60021

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Wonder Woods Subdivision And Wonder Woods Drive Road Improvements
Results
McHenry, IL

Removal and Replacement of PCC Sidewalk
Infrastructure
Bidding
$600,000 est. value
Harvard, IL 60033

Hebron Road Pavement Improvements
Infrastructure
Post-Bid
Hebron, IL

Road Resurfacing - Dorr Township
Results
Less than $467,753 est. value
IL

2022 Sidewalk Program (2nd Street)
Infrastructure
Bidding
$215,000 est. value
Harvard, IL 60033

Road Reconstruction
Infrastructure
Post-Bid
Union, IL 60180

Last Updated 06/15/2022 12:01 AM
Project Title

High Hill Subdivision Improvements

Physical Address View project details and contacts
City, State (County) Algonquin, IL   (McHenry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The base bid of the project includes street and facility improvements to the following streets and facilities: Majestic Drive, Regan Lane, Hartley Drive, Crofton Drive, Westbury Drive, Southwick Drive, Bristol Drive, Kirkland Drive, Jester Lane, and Sussex Lane, Winchester Drive, and High Hill Park Nature Preserve North and South parks. The project will also include spot curb and gutter replacement, sidewalk replacement and utility rehabilitation. Select areas of bike path will be removed while other areas will be removed and replaced. The bike path will be reconstructed with a minimum of 2 1/2" of surface course and 6" of stone base.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents