Similar Projects
Last Updated | 02/24/2023 03:33 AM |
Project Title | Old Spiro Lake Nature Trail |
Physical Address | View project details and contacts |
City, State (County) | Spiro, OK 74959 (Le Flore County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Request for Quotations, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Recreational Trail Program (RTP)-fundedproject consists of the construction of approximately 3,635' of 8'-wide asphalt trails to the immediate east/northeast of Old Spiro Lake. The project consists of tree removal and the construction of a custom concrete trail flume/culvert with pipe railing, asphalt trails, concrete bench pads with benches, two (2)concrete handicap parking spaces, a 5'-wide concrete connector sidewalk, and the installation of two (2) galvanized corrugated steel arch pipes with end sections. Includes tree removal, grading, drainage, paving, signage, and striping work. General description of the project: This Recreational Trail Program (RTP)-funded project consists of the construction of approximately 3,635' of 8'-wide asphalt trails to the immediate east/northeast of Old Spiro Lake. The project consists of tree removal and the construction of a custom concrete trail flume/culvert with pipe railing, asphalt trails, concrete bench pads with benches, two (2) concrete handicap parking spaces, a 5'-wide concrete connector sidewalk, and the installation of two (2) galvanized corrugated steel arch pipes with end sections. Includes tree removal, grading, drainage, paving, signage, and striping work. This is the second bid for the project. The plans have been altered to include a reduction in the base bid and the creation of 2 additive alternates (listed below) and 2 alternates allowing the construction of concrete instead of asphalt trails. The additive alternates include: Additive Alternate #1- Purchase and installation of (6) Benches; and Additive Alternate #2 - Construction of Alignment #2 in the plans. OPTIONAL alternate #3 (included in Addendum #1) includes replacing the asphalt trail with concrete trail in the base bid. OPTIONAL alternate #4 (included in Addendum #1) includes replacing the asphalt trail with concrete trail in the Additive Alternate #2 portion of the project. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |