Similar Projects
Intersection Modification, ADA Improvement and Drainage Repair
Infrastructure
Conception
$1,300,000 est. value
Minneapolis, MN 55403

Intersection Modification, ADA Improvement and Drainage Repair
Infrastructure
Conception
$1,300,000 est. value
Minneapolis, MN 55403

Crystal Community Center Parking Lot and Bassett Creek Dog Park
Infrastructure
Design
$2,079,215 CJ est. value
Crystal, MN 55422

Crystal Community Center Parking Lot and Bassett Creek Dog Park
Infrastructure
Design
$2,079,215 CJ est. value
Crystal, MN 55422

Currie Commons
New Construction, Infrastructure
Bidding
$75,000,000 CJ est. value
Minneapolis, MN 55405

Currie Commons
New Construction, Infrastructure
Bidding
$75,000,000 CJ est. value
Minneapolis, MN 55405

Meadowbrook Elementary School Parking Lot Improvements
Post-Bid
Golden Valley, MN 55422

2021 Trail Maintenance
Infrastructure
Post-Bid
Bloomington, MN

Bituminous Mill and Overlay
Results
Medina, MN

Parking Lot Improvements
Results
Brooklyn Park, MN 55443

2021 Parking Structure Rehabilitation
Construction
$2,408,193 est. value
Minneapolis, Saint Paul, MN 55111

MPHA Family Housing Expansion / Site 4 - Minneapolis Public Housing Authority
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Minneapolis, MN 55404

PetSuites / Maple Grove
New Construction, Infrastructure - 11,000 SF
Pending Verification
$2,500,000 CJ est. value
Maple Grove, MN 55311

Interstate 494, Bush Lake Road to Interstate 35W (Metro District) - 2785-424 - Minnesota Department of Transportation
New Construction, Infrastructure
Conception
$190,500,000 est. value
Bloomington, MN 55438

Rivers Edge Assisted Living
New Construction, Infrastructure - 28,598 SF
Design
$8,000,000 CJ est. value
Brooklyn Park, MN 55443

Last Updated 08/10/2022 04:05 AM
Project Title

2022 Concrete Joint Repair

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55111   (Hennepin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $274,988 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Concrete pavement joint rehabilitation in the area of Airport Lane and Terminal 2 Campus. Items of work include: MnDOT Type A1 and Type BA concrete Joint repairs, Removal and replacement of concrete curb and gutter, replacement of storm sewer castings and pavement markings. Pre-Bid Meeting Info: There will not be a prebid meeting.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents