Similar Projects
Widening SH-3 and conducting levee repair between MP 91.86 and MP 89.26
Infrastructure
Bidding
ID

SH-27 Road Rehabilitation, Burley CL to JCT I-84
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Bidding
ID

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
ID

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Crabs, Upgrading Guardrail, Installing Underdrains, and Increasing Shoulder
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
ID

Ramsey Z-Wall Extension
Addition, Alteration
Results
Coeur d'Alene, ID 83815

Mill and Plant Mix Inlay on SH-97 MP 86.9
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value

Engineering Services for Design Of Worley Minor Streets Repair Phase 2
Infrastructure
Results
Worley, ID 83876

Mill and Inlay on I-90 From Wallace MP 63 to Mullan MP 68
Infrastructure
Bidding
$2,500,000 to $5,000,000 est. value
ID

Placing an Overlay on SH-47 from MP 0.75 to MP 12.42
Infrastructure
Bidding
$1,000,000 to $2,500,000 est. value
ID

Asphalt and then a Plant Mix Overlay on SH-97
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
ID

Last Updated 09/14/2021 05:51 PM
Project Title

Runway 2/20 Pavement Maintenance at Sandpoint Airport

Physical Address View project details and contacts
City, State (County) Sandpoint, ID 83864   (Bonner County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule A: Pavement Rehabilitation (Keel Section) Schedule B: Pavement Patching Schedule C: Pavement Initial Markings Work generally consists of marking removal, milling, asphalt paving and patching, and applying pavement markings on the airfield.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents