Similar Projects
The Metropolitan Park District of Tacoma - A and E Roster for Architectural, Engineering and Surveyor Firms
New Construction, Alteration
Bidding
Tacoma, WA

The Metropolitan Park District of Tacoma - A and E Roster for Architectural, Engineering and Surveyor Firms
New Construction, Alteration
Bidding
Tacoma, WA

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

The Metropolitan Park District of Tacoma
New Construction, Term Contract
Bidding
Tacoma, WA

Electrical Engineering Services
Infrastructure
Post-Bid

Design-Build Services Tacoma Online Learning - Tenant Improvements
Renovation - 12,961 SF
Results
$5,000,000 est. value
Tacoma, WA 98402

RFQ - On-Call Planning Services
Term Contract
Bidding
Tacoma, WA 98405

10th Street South East Improvements
Infrastructure
Post-Bid
Puyallup, WA

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

RFQ Design - Restore Shorelines, Develop Public Access, and Restore a Public Marina at Lakebay
Infrastructure
Bidding
$500,000 CJ est. value
Lakebay, WA 98349

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

NW Trek Animal Operations Area Improvements
New Construction, Demolition
Results
$644,079 est. value
Eatonville, WA 98328

Last Updated 08/23/2022 02:33 AM
Project Title

RFQ Design - Earley Business Center Master Plan and Redevelopment

Physical Address View project details and contacts
City, State (County) Tacoma, WA 98422   (Pierce County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Port of Tacoma (Port) is soliciting Statements of Qualifications (SOQ) from firms (teams) qualified and interested in providing site planning, building design, remediation, permitting, cost estimating and construction support. This project will include master planning and site development for the Earley Business Center in conjunction with design and construction of an approximately 75,000 to 100,000 square foot building. The Port may apply for federal funding for various phases of the Earley Business Center (EBC). Therefore, the contract that results from the RFQ and various work packages will be subject to the Federal Terms and Conditions of each grant. See "Attachment D" for the generic Federal Terms and Conditions, which may be updated per each grant. Questions Due: AUGUST 19, 2022 @ 2:00 PM (PDT) The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents