Similar Projects
South Lake Stevens Road Intersection Improvements
Infrastructure
Bidding

SR 525, Mukilteo Pedestrian and Traffic Improvements MP 8.32 to MP 8.43
Infrastructure
Bidding
WA

I-5, NB Marine View Drive to SR 529 - Corridor and Interchange Improvements Project
Infrastructure
Post-Bid
WA

I-5, NB Marine View Drive to SR 529 - Corridor and Interchange Improvements Project
Infrastructure
Post-Bid
WA

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

SR 9, Bickford Ave Intersection Improvement
Infrastructure
Bidding
WA

Port Gardner Storage Facility
New Construction, Infrastructure
Post-Bid
Everett, WA 98213

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Pacific Avenue Safety - Midblock Crossing
Alteration
Bidding
$650,000 to $900,000 est. value

Small Works Roster - Avenue NE Storm Repair - Phase One
Infrastructure
Post-Bid
Arlington, WA 98223

172nd Street NE & 40th Avenue Signal and Median Improvements
Infrastructure, Alteration
Results
$1,846,000 est. value
Arlington, WA 98223

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

Reported 11/11/2021 12:00 AM
Project Title

8th Street Improvements Project

Physical Address View project details and contacts
City, State (County) Marysville, WA   (Snohomish County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $739,767
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1825 Tons of HMA, a 2-inch asphalt overlay, pavement repair, planing bituminous pavement, sidewalk ramp replacement to meet ADA standards, utility adjustment, channelization, storm sewer, restoration, traffic signal modifications and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents