Similar Projects
Reported | 04/08/2020 12:00 AM |
Project Title | MacArthur Lock Tainter Valve Machinery Replacement |
Physical Address | View project details and contacts |
City, State (County) | Sault Sainte Marie, MI 49783 (Chippewa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFP) |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will be a replacement of the mechanical drive system, excluding the motor (prime mover), used to operate the four (4) filling and emptying tainter valves on the MacArthur Lock. The replacement includes, but is not limited to: strut assembly, strut arm, strut arm shaft, sector gear, counter shaft pinion, counter shaft gear, jack shaft pinion, jack shaft gear, reducer shaft pinion, speed reducer (worm gear), stuffing box, and associated shafts, keys, and bearings. There may also be some electrical wiring upgrades. The larger gears will be manufactured in sectionalized parts and put together at the valves since access to the area is limited. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |