Similar Projects
Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

HVAC and Mechanical Products
Term Contract
Post-Bid

AHU Project at Denver Air Route Traffic Control Center for HVAC Contractor
Results
$200,000 to $300,000 est. value
Longmont, CO

Saint Vrain HUB - AHU Replacement
Results
Longmont, CO 80501

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replace Windows, Stairs and HVAC at Longmont Readiness Center
Results
Less than $350,000 est. value
Longmont, CO 80501

HVAC Protective Monitoring
Term Contract
Post-Bid
Longmont, CO 80501

NIST Building 42 Central Utility Plant - Cooling Tower Upgrade
Results
$1,000,000 to $5,000,000 est. value
Boulder, CO 80305

Nextlight HVAC System
Alteration
Post-Bid
Longmont, CO

Chiller Replacement
Results
Longmont, CO 80503

USAFA Fy22 Grease Laden Duct Cleaning Service
Term Contract
Post-Bid

Heat Exchanger Tube Bundles
Results

Cool Tower Demo
Alteration
Post-Bid
$591,181 est. value
Boulder, CO

Courthouse Third Floor Remodel Mechanical HVAC and Plumbing
Results
Boulder, CO 80302

HVAC Maintenance
Alteration
Post-Bid
$2,180,000 est. value
Boulder, CO

Last Updated 03/07/2022 05:59 AM
Project Title

2022 Mechanical Preventive Mainteance

Physical Address View project details and contacts
City, State (County) Lafayette, CO   (Boulder County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Develop, Schedule, and perform a comprehensive Preventive Maintenance inspection plan and work plan to provide basic maintenance and repairs of all heating and cooling piping systems and equipment, to include cooling/heating lines, condensate lines, steam systems, refrigeration systems, related components and equipment. This includes, but is not limited to, HVAC systems, including chilled water systems, condensing units, ventilation & circulation systems, mini-split systems, humidifiers, VAV and other air moving systems, and pumps. In addition, this scope includes boilers, expansion tanks, furnaces, infrared heaters, baseboard heaters, water heaters, exhaust fans, various pumps, chemical feeders found in a commercial pool system, and various other systems as listed.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents