Similar Projects
Public Ice Rink
New Construction
Conception
Huntley, IL

East Aurora High School Esports Lounge
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Aurora, IL 60505

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Central Dietary - Temperature Controls
Renovation
Results
Less than $100,000 est. value
Elgin, IL 60123

Main Office VRF System
Results
South Elgin, IL 60177

HVAC Building Automation System (BAS) Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
IL

HVAC Building Automation System (BAS) Maintenance and Repair Services
Alteration
Results
Geneva, IL

HVAC and Plumbing Mechanicals Maintenance and Repair Services
Term Contract
Post-Bid
IL

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

Install New Central Air Conditioner Units
Alteration
Post-Bid
Aurora, IL 60505

Replace Chiller - Forensic Treatment Complex
Renovation - 140,000 SF
Results
$966,000 CJ est. value
Elgin, IL 60123

Weatherization (IHWAP) Program
Term Contract
Post-Bid

HVAC Mechanicals Maintenance and Repair Services
Term Contract, Alteration
Results
IL

HVAC Time & Material
Term Contract
Post-Bid
Algonquin, IL

Last Updated 08/05/2022 05:32 PM
Project Title

Upgrade HVAC - Erickson Hall Gymnasium

Physical Address View project details and contacts
City, State (County) Sugar Grove, IL 60554   (Kane County)
Category(s) Entertainment/Recreation, Single Trades
Sub-Category(s) Athletic Facility, HVAC
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $799,000 [brand] Estimate
Plans Available from Electrical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 05, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** AE Estimate: Less than $400,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents