Similar Projects
2021 CDBG Wastewater Improvements
Renovation
Design
$6,000,000 CJ est. value
Morton, MS 39117

AutoZone #5451 / Morton
New Construction, Infrastructure - 6,500 SF
Design
$1,200,000 CJ est. value
Morton, MS 39117

RFP Homeowner Rehabilitation/Reconstruction
Infrastructure
Bidding
Forest, MS 39074

Construction of the 2022 Roadway Improvements
Infrastructure
Post-Bid
$200,000 CJ est. value
Morton, MS 39117

Raytheon Water Well
Infrastructure
Post-Bid
$300,000 CJ est. value
Forest, MS 39074

2022 Roadway Improvements
Infrastructure
Results
$1,709,212 CJ est. value
Morton, MS 39117

2021 CDBG Wastewater Improvements Project
Renovation
Results
$823,500 CJ est. value
Morton, MS 39117

Amazon Pearl River Solar Farm / Scott County
New Construction, Infrastructure
Construction
$235,000,000 CJ est. value
Morton, MS 39117

Box Bridge and Approaches on Denson Road
Infrastructure
Post-Bid
$500,000 CJ est. value
Morton, MS 39117

Construction of a New Maintenance Building for Thomasville Water Association
New Construction, Infrastructure
Results
$299,000 CJ est. value
Forest, MS 39074

Replacement of Deficient Bridges With New Structures on Pea Ridge Road
Demolition, New Construction, Infrastructure
Post-Bid
$900,000 CJ est. value
Forest, MS 39074

Front Street Bank Stabilization
Infrastructure
Results
$211,000 CJ est. value
Forest, MS 39074

Breakroom Office Building
New Construction, Infrastructure - 10,296 SF
Post-Bid
$2,200,000 CJ est. value
Forest, MS 39074

Channel Improvement, Baleshed Landing Dikes 2,3, and 4, Dike Construction
Infrastructure
Results
$4,889,800 CJ est. value
Forest, MS 39074

Water System Improvements Project
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Forest, MS 39074

Last Updated 07/26/2023 05:06 AM
Project Title

2023 Wastewater Improvements Project

Physical Address View project details and contacts
City, State (County) Morton, MS 39117   (Scott County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the rehabilitation or replacement of gravity sewers and manholes, and a new grinder pump station. The Contract Time will be One Hundred Eighty (180) consecutive calendar days, and the liquidated damages will be $200 per consecutive calendar day thereafter. The City hereby notifies all Bidders that it will affirmatively insure that in any contract entered into pursuant to this notice, disadvantaged, and women's business enterprises will be afforded the full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Bidders must be qualified under Mississippi State Law and show a Certificate of Responsibility issued by the Mississippi State Board of Public Contractors. Bids shall be submitted in duplicate and sealed. All bids shall be clearly marked "2023 Wastewater Improvements" with the date and time of the bid opening on the outside of the sealed envelope. Each bidder shall write his Certificate of Responsibility number and Mississippi License number on the outside of the sealed envelope containing his bid. Each bid shall be accompanied by a Certified Check on a solvent bank or a Bidder's Bond issued by a Surety Company licensed to operate in the State of Mississippi, in the amount of five percent of his bid, payable to the City of Morton, MS as bid security. The successful Bidder will be required to execute a Performance Bond and a Payment Bond, each in the amount of 100 percent of the Contract, issued by a Surety company licensed to operate in the State of Mississippi. Bidders shall submit a current financial statement if requested by the City. Attorneys-in-fact who sign Payment Bonds must file with each bond a certified and effective dated copy of their Power of Attorney. No Bidder may withdraw his bid for a period of sixty (60) days after date of actual bid opening, without Owner's consent. Funding for the project is through a Mississippi Municipal and County Water Infrastructure Grant, MDEQ Agreement No. 356-1-CW-5.5. Contractor shall conform to the grant requirements. The City of Morton furthers its support of Fair Housing and Equal Opportunity for all individuals. The City of Morton, Mississippi reserves the right to waive any formalities or to reject any or all bids received.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents