Similar Projects
2023 Bond - Central School District 301
New Construction, Infrastructure, Renovation
Conception
$195,000,000 CJ est. value
Sycamore, IL 60178

2023 Bond - Central School District 301
New Construction, Infrastructure, Renovation
Conception
$195,000,000 CJ est. value
Sycamore, IL 60178

First United Methodist Church
New Construction, Infrastructure - 10,986 SF
Design
$600,000 CJ est. value
Dekalb, IL 60115

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Sycamore St. Lift Station and Force Main Replacement
Renovation, Infrastructure
Bidding
$2,900,000 CJ est. value
Somonauk, IL 60552

Snow Plow Service 2021-2022
Term Contract
Post-Bid
Sandwich, IL

Aluminized PC, Type 1, Various Size - Total 2112 Feet / Aluminized PC, Type 1, Connecting Band - Total 29 Each.
Infrastructure
Post-Bid
De Kalb, IL

Resurfacing, Sidewalk Replacement, Curb and Gutter, Pavement Markings and Pedestrian Signal Improvements
Infrastructure
Results
De Kalb, IL

Various Highways throughout District 3
Infrastructure
Results

RFQ Design - Construct Northern Illinois Center for Community Sustainability
New Construction, Infrastructure - 30,000 SF
Pending Verification
$15,000,000 CJ est. value
Dekalb, IL 60115

Fisk Avenue Multi-Residential Development
Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Dekalb, IL 60115

Well #7 Radium Treatment Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Sycamore, IL 60178

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RR-21-4821 Pavement Repairs
Infrastructure
Results

Site improvements at the Milestone Dog Park
Infrastructure
Bidding
$250,000 CJ est. value
Sandwich, IL 60548

Last Updated 03/14/2023 06:31 AM
Project Title

Intersection With Us 30 (2.0 Mile East of Waterman)

Physical Address View project details and contacts
City, State (County) Dekalb, IL 60115   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $431,778 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located in Clinton Township, approximately 40 feet north of the intersection with US 30 (2.0 mile east of Waterman) in DeKalb County. D-93-063-22 P-93-036-08 R-93-009-09 Region 2 District 3 Federal Project County(s) DeKalb Key Route(s ) TR 154 Marked Route(s) CREGO ROAD Section(s) (116)CR-5309 State Job #(s) C-93-085-22 PPS #(s) 3-15980-0000 Completion Date: 30 Working Days Questions not accepted as of January 10, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 30, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 090 - Intersection With Us 30 (2.0 Mile East of Waterman)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents