Similar Projects
Jaeger Usa, Inc.Textile Tapes Storage Addition
Addition - 782 SF
Conception
Rochester, NH 03867

Warehouse
New Construction - 800,000 SF
Conception
$10,000,000 CJ est. value
Kingston, NH

Nylon Corporation Addition
Addition - 9,150 SF
Design
Manchester, NH 03101

Storage Building and Landscape Material Bins
New Construction - 720 SF
Design
Less than $500,000 CJ est. value
Rochester, NH 03867

Highway Garage Storage Addition
Addition
Bidding
Orford, NH

Equipment Storage Building
New Construction
Bidding
Bow, NH 03304

Construct Salt Building
Post-Bid
Less than $445,000 est. value
Milan, NH 03588

West End Yards Commercial Building
New Construction - 45,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Portsmouth, NH

MST Metal Building Addition Design-Build
Addition
Results
Manchester, NH

Design-Build for 24,000 Square Foot Manufacturing Building
New Construction - 24,000 SF
Results
Rochester, NH

Raytheon Expansions
Addition - 4,300 SF
Construction
Pelham, NH

Flatley Mixed Use
New Construction - 100,000 SF
Construction
$1,000,000 to $2,000,000 est. value
Merrimack, NH 03054

Amazon Distribution Center
Build-Out
Pending Verification
Hudson, NH 03051

Professional Offices and Warehouse
Renovation
Conception
Merrimack, NH 03054

Hudson Logistics Center
New Construction
Design
Hudson, NH 03051

Last Updated 07/20/2021 06:24 AM
Project Title

Construct New Storage Facility

Physical Address View project details and contacts
City, State (County) Pembroke, NH 03275   (Merrimack County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is to construct a new (1) story 2,600 SF building to store two (2) Type 6 firefighting vehicles and associated fire-fighting equipment. Building to include toilet room, changing /shower room, storage and electrical room. Site work to include clearing of an existing tree line for new underground utilizes, new filtration basin, septic tank, leach field, and parking for personnel vehicles The Project will include the Discipline(s) of:_Site Construction, Concrete, Masonry, Metals, Structural Steel Frame, Wood and Plastics, Thermal and Moisture Protection, Doors and Windows, Finishes, Specialties, Equipment, Special Construction, Mechanical, Electrical.

Details

Warehouse/Storage, 1 Story Above Grade, 2,600 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents