Similar Projects
Cumberland Healthcare Replacment Campus
New Construction - 94,000 SF
Post-Bid
$5,000,000 to $10,000,000 est. value
Cumberland, WI

Renovate 7AN for GI/GU and Procedure Clinic
Renovation - 11,000 SF
Results
$2,000,000 to $5,000,000 est. value
Milwaukee, WI

Froedtert & The Medical College Of Wisconsin Neighborhood Hospital
New Construction - 17,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Mequon, WI 53092

Crisis Restoration And Triage And Restoration Center Planning Consultant
New Construction
Post-Bid
WI

ACM T&M Renovate and Expand Dialysis Clinic
Renovation
Results
Milwaukee, WI

Correct Security & Environmental Deficiencies
Post-Bid
Tomah, WI 54660

Rocky Knoll Facility Improvements
Renovation
Bidding by Invitation
Plymouth, WI 53073

Sherman Hall Bathrooms Remodel - General
Renovation
Results
Less than $2,300,000 est. value
Oshkosh, WI 54901

Stevens Point Aspirus Hospital AHU Addition
Addition
Post-Bid
Stevens Point, WI 54482

Marshfield Clinic Stevens Point Center Hospital Addition
New Construction - 30,250 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Stevens Point, WI 54482

Last Updated 01/18/2021 12:21 PM
Project Title

Construction Manager at Risk for North Central Health Care Campus

Physical Address View project details and contacts
City, State (County) Wausau, WI 54403   (Marathon County)
Category(s) Medical
Sub-Category(s) Hospital
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager at Risk services for remodeling of existing campus buildings on the North Central Health Care Campus. The construction and remodel will be based off the findings of the 2018 Master Facility Plan and the Conceptual Design completed by Angus Young Architects in 2018-19. The existing facilities to remodel include: the 2 story (49,142 square foot) existing long term care facility, Mount View Care Center and the existing Lakeview Heights, D wing, the 2 story (18,723 square foot) wing consisting of crisis intake, medically monitored treatment and behavioral health; as well as an approximately 800 square foot addition to that wing; and remodel of the existing (14,150 square feet) F building to purchasing, receiving, storage and loading dock.

Details

,, 82,815 SF - Hospital, 2 Stories Above Grade, 49,142 SF Renovation, Hospital, 2 Stories Above Grade, 18,723 SF Renovation, Hospital, Approximately 800 SF Addition, Hospital, 14,150 SF Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents