Similar Projects
2023 Mill and Overlay Improvements Project
Infrastructure
Bidding
$860,000 CJ est. value
Minnetrista, MN 55359

City Wide Trail Gap Improvements Project
Infrastructure
Bidding
$500,000 CJ est. value
Lakeville, MN 55044

Orness Plaza Heat Pump Removal and Replacement - Phase 1
Renovation
Sub-Bidding
$294,000 CJ est. value
Mankato, MN 56001

Corrugated Metal Culverts
Term Contract
Sub-Bidding
Thief River Falls, MN 56701

Water Softener Installation
Post-Bid
Faribault, MN

2022 Seasonal Work and Materials
Term Contract
Post-Bid
Faribault, MN

General Contractor for 1314 North 44th Avenue Piping
Alteration
Results
Minneapolis, MN 55412

Curling Facility Refrigeration System Replacement
Renovation, Alteration
Results
Duluth, MN 55802

Pipe Insulation
Term Contract
Post-Bid
MN

2021 Plumbing Infrastructure Upgrade Program
Alteration
Results
Minneapolis, MN

Plumbing Services at all MCES Locations
Alteration
Post-Bid
Minneapolis, MN

Mechanical Pipefitting Services for all MCES Facilities
Alteration
Results
MN

Twin Cities Habitat for Humanity Plumbing
Alteration
Post-Bid
Saint Paul, MN 55106

Plumbing Services
Term Contract
Results
Byron, Rochester, MN

Birch Lake ES Domestic Piping Replacement
Alteration
Post-Bid
White Bear Lake, MN 55110

Last Updated 03/06/2023 03:32 AM
Project Title

Sunrise Prairie Regional Trail

Physical Address View project details and contacts
City, State (County) Center City, MN 55012   (Chisago County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,221,929 [brand] Estimate
Plans Available from Civil Engineer - 01/12/23
Owner View project details and contacts
Architect View project details and contacts
Description

Description: Construction of Bituminous and Concrete Trail, includes Drainage, Concrete Curb and Gutter, and Signage . It is proposed to construct a new 2.8-mile-long bituminous surfaced trail along the east side of CSAH 30 from 410 th Street to CSAH 10. The trail is intended for non-automotive traffic including pedestrian, bicycle, ATV, and snowmobiles. 3.7 ACRE Clearing and Grubbing 750 S Y Remove Bituminous Pavement 8,200 C Y Excavation - Common (P) 17,300 C Y Common Embankment (CV) (P) 19,400 S Y Subgrade Preparation (P) 3,400 C Y Aggregate Base (CV) Class 5 (P) 2,900 TON Type SP 9.5 Wearing Course Mix (2,B) 500 TON Type SP 12.5 Non Wear Course Mix (3,C) 900 L F 12" - 18" CS Pipe Culvert 200 L F 12" - 24" RC Pipe Culvert 5 L F Construct Drainage Structure Des 48-4020 3,650 S F 6" Concrete Walk 1,010 L F Concrete Curb and Gutter Design B424 1,200 L F Wire Fence Design 42V-9322 1 L S Traffic Control 105 S F Sign 1 SYS Pedestrian Crosswalk Flasher System 7.8 ACRE Seeding 630 L F 4" Solid Line Paint

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents