Similar Projects
Bellmar Village
New Construction, Infrastructure
Conception
$300,000,000 CJ est. value
Immokalee, FL 34142

Longwater Village
New Construction, Infrastructure - 65,000 SF
Conception
$250,000,000 CJ est. value
Naples, FL 34102

Old Naples Hotel at Third Street Plaza
Demolition, New Construction, Infrastructure - 3,800 SF
Design
$35,000,000 CJ est. value
Naples, FL 34102

Sidewalk/Milling and Resurfacing/Base Work
Infrastructure
Design
$4,361,899 CJ est. value
Everglades City, FL 34139

Collier County Fire and EMS Station 74
New Construction, Infrastructure
Bidding
$8,157,587 CJ est. value
Naples, FL 34120

Pump Station 305.12 Rehabilitation
Build-out, Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Naples, FL 34112

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Master Pump Station 302.00 Site Improvements
Alteration
Post-Bid
$2,085,000 est. value
FL

Lowdermilk Park - ATV Storage Building - Re-Bid
New Construction, Infrastructure - 9,000 SF
Results
$359,530 CJ est. value
Naples, FL 34102

Golden Gate City Transmission Water Main Improvements - Phase 1
Infrastructure
Results
$13,100,000 est. value
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Rooms To Go / Naples
New Construction, Infrastructure - 48,641 SF
Construction
$1,500,000 CJ est. value
Naples, FL 34103

Naples Beach Club Redevelopment
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$250,000,000 CJ est. value
Naples, FL 34102

St. Matthew's House Renovation
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Naples, FL 34112

1st Avenue South Improvements - 22C02 - City of Naples
Infrastructure
Conception
$6,272,000 CJ est. value
Naples, FL 34102

Last Updated 05/01/2023 10:36 AM
Project Title

South Water Treatment Plant (SWTP) West High Service Pump Station

Physical Address View project details and contacts
City, State (County) Marco Island, FL 34145   (Collier County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Marco Island is soliciting bids to construct a new high service pump station (HSPS) and flow meter pad at the South Water Treatment Plant located at 415 Lily Court, Marco Island, FL 34145. The scope of work includes but not limited to: 1. Demolition of the existing West HSPS and flow meter vault including associated equipment, pipes and other appurtenances. a. Demolish the whole structure of the existing building and the associated equipment and pipes. b. Demolish the flow metering vault. c. Demolish the existing West HSPS suction and discharge pipes. 2. Soil stabilization of the site for the new West HSPS. 3. New West HSPS and pipework: a. Construction of a CME block building, sub-divided into a pump room and an electrical room. b. Installation of two vertical turbine pumps and one additional pump can, compete with motors, and all associated piping, fittings, valves, and instrumentation in the pump room. Both pumps will be operated on variable frequency drives (VFDs). Provision will be made for a future fourth pump as indicated on the drawings, including the installation of its suction piping and pump can. c. Installation of all electrical switchgear, MCCs, panels, VFDs, and other equipment in the electrical room. Installation of air conditioning in the electrical room. d. Construction of the associated suction and discharge pipes, valves, and appurtenances. 4. New flow meter pad. 5. All associated electrical, instrument and control, fire protection, civil and geotechnical works. Bid Bond 5% Plan (blueprint) Electronic plan documents eBidding No

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents