Similar Projects
Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Urban Grading, PCC Surfacing, Storm Sewer, Curb and Gutter, Sidewalk, Lighting, Signals
Infrastructure
Conception
$10,576,000 CJ est. value
Huron, SD 57350

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Structure and Approach Grading - Huron Area
Infrastructure
Bidding
$445,000 CJ est. value
Huron, SD 57350

11th Avenue Reconstruction - Phase 2
Infrastructure
Bidding
$3,000,000 CJ est. value
Belle Fourche, SD 57717

Lake Platte Spillway and Bridge Repairs
Infrastructure
Post-Bid
$401,000 CJ est. value
Platte, SD 57369

Fort Thompson Dental & Optometry Addition
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Fort Thompson, SD 57339

FB&T Arena and SJM Additions and Renovations - Bid Package 02
Addition, Demolition, Renovation, Infrastructure
Results
$143,000 CJ est. value
Brookings, SD 57006

Structure and Approach Grading
Infrastructure
Results
$850,000 est. value
Brookings, SD

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

10th Avenue Bridge Replacement - City of Belle Fourche
Infrastructure
Pending Verification
$86,200 CJ est. value
Belle Fourche, SD 57717

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$5,040,000 CJ est. value
Tyndall, SD 57066

Structure and Approach Grading
Infrastructure
Design
$445,000 CJ est. value
Newell, SD 57760

Low Slump Dense Concrete Overlay, Approach Slabs, Joints, Bridge Rail, End Blocks
Infrastructure
Bidding
$1,653,000 CJ est. value
Aurora, SD 57002

Last Updated 12/27/2023 02:02 PM
Project Title

Big Bend Replacement of Left Abutment Collector Pipe System

Physical Address View project details and contacts
City, State (County) Fort Thompson, SD 57339   (Buffalo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dam/Tunnel, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $4,191,845 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of December 27, 2023, the project has not been awarded. A timeline for award has not been confirmed. **UPDATE 1 March 2023 - Abstract for Step-Two Sealed Bids Posted** Results of Step 1 - Technical Evaluation of the Two Step IFB process The following firms submissions have been identified as being technically acceptable and shall proceed to Step 2 of the Two Step IFB process. ESI (Elite Surface Infrastructure) 1199 Atchison Court, Castle Rock, Colorado 80109 Fenton Construction Inc. PO Box 2669, Sioux City, Iowa 51106 Montcal LLC. PO Box 1119, Plains, Montana 59859 - Bids will be due on 16 March 2023 - ***Site Visit Sign-In Sheet and Agenda Attachments have been posted as of 18 January 2023 at 1245 CT. Please see documents in the attachment section.*** ***AMENDMENT 0001 - A TIME EXTENSION HAS BEEN CHANGED FROM 4 JANUARY 2023 TO 1 FEBRUARY 2023. IN ADDITION, A SECOND SITE VISIT HAS BEEN SCHEDULED FOR 18 JANAUARY 2023 AT 1000 CT. PLEASE REVIEW THE ATTACHED SF30 - MODIFICATION AM0001 FOR UPDATES. *** Big Bend Replacement of Left Abutment Collector Pipe System, Fort Thompson, South Dakota The contractor shall furnish all personnel, services, equipment, materials and other requirements necessary for Replacement of Left Abutment Collector Pipe near the toe of the dam. The work includes but not limited to dewatering of the area, proper disposal of contaminated soil and water, excavation, removal and replacement of slotted and solid pipes, placement of 2 stage filter, installation of manholes, backfill, and seeding. The Contract Method: 2-Step IFB Process, with Step-One being posted on 1 December 2022 with Proposal due date of 4 January 2023 by 2:00 PM CT. Tentative Site Visit Date and Time: 12 December 2022 at 10:00 AM CT - See solicitation for further information regarding the Site Visit. ROM: $1 - $5 million dollars

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents