Project Title | Big Bend Replacement of Left Abutment Collector Pipe System |
Physical Address | View project details and contacts |
City, State (County) | Fort Thompson, SD 57339 (Buffalo County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Dam/Tunnel, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Request for Qualifications, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,191,845 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of December 27, 2023, the project has not been awarded. A timeline for award has not been confirmed. **UPDATE 1 March 2023 - Abstract for Step-Two Sealed Bids Posted** Results of Step 1 - Technical Evaluation of the Two Step IFB process The following firms submissions have been identified as being technically acceptable and shall proceed to Step 2 of the Two Step IFB process. ESI (Elite Surface Infrastructure) 1199 Atchison Court, Castle Rock, Colorado 80109 Fenton Construction Inc. PO Box 2669, Sioux City, Iowa 51106 Montcal LLC. PO Box 1119, Plains, Montana 59859 - Bids will be due on 16 March 2023 - ***Site Visit Sign-In Sheet and Agenda Attachments have been posted as of 18 January 2023 at 1245 CT. Please see documents in the attachment section.*** ***AMENDMENT 0001 - A TIME EXTENSION HAS BEEN CHANGED FROM 4 JANUARY 2023 TO 1 FEBRUARY 2023. IN ADDITION, A SECOND SITE VISIT HAS BEEN SCHEDULED FOR 18 JANAUARY 2023 AT 1000 CT. PLEASE REVIEW THE ATTACHED SF30 - MODIFICATION AM0001 FOR UPDATES. *** Big Bend Replacement of Left Abutment Collector Pipe System, Fort Thompson, South Dakota The contractor shall furnish all personnel, services, equipment, materials and other requirements necessary for Replacement of Left Abutment Collector Pipe near the toe of the dam. The work includes but not limited to dewatering of the area, proper disposal of contaminated soil and water, excavation, removal and replacement of slotted and solid pipes, placement of 2 stage filter, installation of manholes, backfill, and seeding. The Contract Method: 2-Step IFB Process, with Step-One being posted on 1 December 2022 with Proposal due date of 4 January 2023 by 2:00 PM CT. Tentative Site Visit Date and Time: 12 December 2022 at 10:00 AM CT - See solicitation for further information regarding the Site Visit. ROM: $1 - $5 million dollars |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |