Similar Projects
Water Chemical Building and Appurtenances - City of San Angelo
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
San Angelo, TX 76903

Lake Operations Maintenance Facility - City of San Angelo
New Construction, Infrastructure
Conception
$6,687,464 CJ est. value
San Angelo, TX 76904

Rebid Construction of a Metal Building Closures Over the Water Distribution System Pump Stations
New Construction, Infrastructure
Design
$437,249 CJ est. value
San Angelo, TX 76903

San Angelo Crossing
New Construction, Infrastructure - 50,038 SF
Design
$4,950,549 CJ est. value
San Angelo, TX 76901

B140 Foundation Repair
Infrastructure
Bidding
$500,000 CJ est. value
Goodfellow AFB, TX 76908

Pizza Hut/ San Angelo
New Construction, Infrastructure - 1,527 SF
Bidding
$600,000 CJ est. value
San Angelo, TX 76903

Veribest ISD Elementary School Addition - Phase 1 - CSP 03B, 27C, & 28B REBID
Addition, Demolition, Infrastructure - 11,998 SF
Sub-Bidding
$4,245,992 CJ est. value
San Angelo, TX 76905

Veribest ISD Elementary School Addition - Phase 1 - CSP 03B, 27C, & 28B REBID
Addition, Demolition, Infrastructure - 11,998 SF
Sub-Bidding
$4,245,992 CJ est. value
San Angelo, TX 76905

AutoZone #5815 / San Angelo
New Construction, Infrastructure - 6,500 SF
Post-Bid
$1,500,000 CJ est. value
San Angelo, TX 76903

Construction of a Field House
New Construction
Post-Bid
$1,609,000 est. value
San Angelo, TX

RM 584 - Bridge Maintenance
Infrastructure
Results
$3,706,380 CJ est. value
San Angelo, TX 76904

2023 Sealcoat Project
Infrastructure
Results
$4,651,396 CJ est. value
San Angelo, TX 76903

Kohl's Site Development and Erosion Control
Alteration
Construction
San Angelo, TX 76901

Kohl's Site Development and Erosion Control
Alteration
Construction
San Angelo, TX 76901

Addition to Double Barrel Fabrication
Addition, Demolition, Renovation, Infrastructure - 5,500 SF
Pending Verification
$250,000 CJ est. value
San Angelo, TX 76905

Last Updated 02/15/2023 02:21 PM
Project Title

Veribest ISD Elementary School Addition - Phase 1

Physical Address View project details and contacts
City, State (County) San Angelo, TX 76905   (Tom Green County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,245,992 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

VERIBEST ISD - ELEMENTARY ANNEX - PHASE 1 Project scope consists of but is not limited to demolition, site work and addition of a new 11,998-square foot educational facility. Scope of Work: CSP 01-B FINAL BUILDING CLEANING CSP 03-B CONCRETE CSP 04-A MASONRY CSP 05-A STRUCTURAL STEEL & ERECTION CSP 06-A MILLWORK CSP 07-A ROOFING & SHEET METAL CSP 08-A FRAMES, DOORS & HARDWARE CSP 08-B GLASS & GLAZING CSP 09-A DRYWALL & ACOUSTICAL CSP 09-C CERAMIC TILE CSP 09-D FLOOR COVERING CSP 09-E PAINTING & WALLCOVERING CSP 10-A BUILDING SPECIALTIES CSP 10-G IDENTIFICATION DEVICES CSP 22-A MECHANICAL: PLUMBING CSP 23-A MECHANICAL: HVAC CSP 26-A ELECTRICAL CSP 27-A VOICE & DATA CABLING CSP 27-B A/V SYSTEM CSP 27-C COMMUNICATION SYSTEMS CSP 28-A FIRE ALARM CSP 28-B SECURITY SYSTEMS CSP 31-A EXCAVATION CSP 31-E TERMITE CONTROL CSP 32-B LANDSCAPE & IRRIGATION CSP 32-F TENNIS COURTS CSP 33-A SITE UTILITIES FOR QUESTIONS AND CLARIFICATIONS, PLEASE CONTACT LANCE AARON @ laaron@gallaghertx.com A. Furnish and install conduit stubs in walls and floors for cable routes by Electrical Contractor B. Furnish and Install 4-11/16" square by 2-1/8" deep flush mounted box(s) by Electrical Contractor C. Furnish and install conduit pathway in between buildings for fiber optic connectivity by Electrical Contractor 1. Includes, but not limited to, integrating conduit pathway with existing overhead canopy for connectivity into the cafeteria D. Furnish and Install Telecommunications Room Cable Tray by Telecommunications Contractor E. Furnish and Install all hangers and support mechanisms required to properly support all telecommunications cable by Telecommunications Contractor

Details

11,998 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents