Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

JBLM North Access Improvement
Infrastructure
Bidding
$12,000,000 est. value
Lakewood, WA

Miscellaneous COF Upgrades
Infrastructure, Alteration
Bidding
$550,000 est. value
Moses Lake, WA 98837

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA 99218

Western Gateway
Infrastructure
Bidding
$2,400,000 to $2,500,000 est. value
Shelton, WA 98584

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

East Pioneer Improvements Academy to Glenn
Infrastructure
Bidding
Montesano, WA 98563

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Lower Grand Industrial Area Lid Retrofits
Infrastructure
Bidding
$1,700,000 to $1,900,000 est. value
Vancouver, WA

Last Updated 02/23/2022 09:47 AM
Project Title

Water Main Replacement Phases 2 and 3

Physical Address View project details and contacts
City, State (County) Puyallup, WA 98371   (Pierce County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing water main in the Manorwood area is 4-inch and 6-inch PVC pipe. The water main was installed in the 1970s and is approaching the end of its useful service life. When this water main was installed, it was not bedded properly, resulting in numerous water main breaks and significant property damage. Phase 2 includes replacement of approximately 2,000 feet of main with 4-inch and 8-inch water pipe along 32nd Ave SE and 28th St SE. Phase 3 includes replacement of approximately 1,250 feet of main with 8-inch water pipe along 33rd Ave SE, between 32nd Ave SE and 27th Pl SE, and 27th Pl SE, between 33rd Ave SE and Manorwood Dr. Additionally, this project will replace all fire hydrants, water services, and appurtenances along these alignments.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents