Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

Joslyn Senior Center Renovation
Renovation, Infrastructure
Bidding
$597,958 CJ est. value
Redlands, CA 92373

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

Sand and Crushed Aggregate Base
Term Contract
Sub-Bidding
Redlands, CA 92373

Gravel Mulch, Rock Blanket, and Imported Borrow
Infrastructure
Sub-Bidding
$5,900,000 CJ est. value
Needles, CA 92363

Z1da-- 605-19-410 Upgrade Parking Lot -Lighting and Conduit
Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
Loma Linda, CA

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Replace Jointed Plain Concrete Pavement
Alteration
Results
$3,800,000 est. value
CA

Replace Pcc and Ac Pavement With Jpcp and Hma Pavement
Infrastructure
Results
CA

Rathbun Creek Trailhead Restroom and Parking Lot - City of Big Bear Lake
Infrastructure
Conception
$660,000 est. value
Big Bear Lake, CA

Pumalo Street Townhomes
New Construction, Infrastructure
Design
$4,500,000 est. value
San Bernardino, CA 92404

Olympic View Drive - Skyview Ridge Drive Pavement Rehabilitation Project - Rebid
Infrastructure
Bidding
$520,000 CJ est. value
Chino Hills, CA 91709

Last Updated 08/01/2022 04:06 PM
Project Title

CSA 70, R-40 Upper North Bay Road Chip Seal Project

Physical Address View project details and contacts
City, State (County) San Bernardino, CA 92352   (San Bernardino County)
Category(s) Heavy and Highway, Outdoor Lighting, Single Trades
Sub-Category(s) Concrete, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

CSA 70, R-40 Upper North Bay Road Chip Seal Project Road surface preparation, the application of emulsion and 5/16 chip seal on approximately 38,845 Square Feet of existing asphalt paved surfaces, rolling, compacting and sweeping, clean up, traffic control, including a fog seal and all other work necessary to satisfactorily complete this project, Bonds and insurance required as stipulated in the bid documents.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents