Similar Projects
Infrastructure Improvements Projects-Construction Qualifications
Term Contract
Bidding
Southfield, MI

1.02 MI of Hot Mix Asphalt Cold Milling and Resurfacing
Bidding
MI

Contractor Qualifications 2019-2020 Infrastructure Improvement Projects
Post-Bid
Southfield, MI 48076

Contractor Qualifications 2019-2020 Infrastructure Improvement Projects
Post-Bid
Southfield, MI 48076

2019-20 Pavement Reconstruction and Water Main Repalcement Project
Results
Huntington Woods, MI

Maintenance Modified Hand Patching Program
Results
Beverly Hills, MI

Grant St Paving Project (Lincoln To Humphrey And Bird To 14 Mile)
Bidding
Birmingham, MI

Cold Patch-High Performance, Annual Estimated Quantities
Term Contract
Post-Bid
Beverly Hills, MI

Cooley Lake Road over Teeple Creek Culvert Replacement
Results
Less than $666,360 est. value
Commerce Township, MI

Flex Seal Program
Bidding
Farmington Hills, MI

Right of Way Services
Post-Bid
MI

2019 Asphalt Paving Program
Results
Birmingham, MI

2021 Pavement Resurfacing Project
Bidding
Huntington Woods, MI 48070

Chubb Road Paving Project
Post-Bid
New Hudson, MI

Brittany Drive Culvert Reconstruction Project
Results
Less than $699,443 est. value
Farmington Hills, MI

Reported 02/26/2020 12:00 AM
Project Title

Buno Road Bridge Approach Hike Bike Trail Repairs

Physical Address View project details and contacts
City, State (County) Milford, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes furnishing all labor, equipment and materials necessary to complete the work including removal of existing asphalt pavement, preparation for and construction of new concrete pavement, construction of drainage improvements and all incidental construction at Kensington Metropark in Oakland County, Michigan.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents