Similar Projects
2021 Amp 10 - Five Mile Creek West Force Main Improvements
Infrastructure
Bidding
$2,200,000 est. value
Birmingham, AL

Sanitary Sewer System - Asset Management Program
Infrastructure
Bidding
$400,000 est. value
Birmingham, AL

UAB West Pavilion Kitchen Piping Replacement - Phase 3 for The UAB Health System
Post-Bid
Birmingham, AL 35249

Hoover - Inverness Greenway Force Main Project
Post-Bid
Hoover, AL

Henry Crumpton SSO Abatement
Results
$1,300,000 to $1,600,000 est. value
Birmingham, AL

2021 On-Call Sewer Services
Results
Less than $2,000,000 est. value
Birmingham, AL

2022 On-Call Sewer Services
Infrastructure
Post-Bid
$2,350,000 est. value
Birmingham, AL

2021 Structural Defect Identification and Replacement
Results
Less than $6,200,000 est. value
Birmingham, AL

2022 AMP07 Sewer Replacement
Infrastructure
Post-Bid
$4,400,000 est. value
Birmingham, AL

Swan Creek Trunk Sewer Improvements - Phase 2
Results
$1,364,640 est. value
Birmingham, AL

2022 AMP08 Structural Defect Identification and Replacement
Infrastructure
Post-Bid
$6,200,000 est. value
Birmingham, AL

Residential Septic Tank Installation and Repair
Results
Birmingham, AL

Sanitary Sewer System - Asset Management Program - Pump Station Upgrades
Renovation, Infrastructure
Post-Bid
$3,500,000 est. value
Birmingham, AL

Manhole Sewer Covers
Term Contract
Results
Birmingham, AL

Hoover High School PS Comprehensive Rehabilitation
Infrastructure
Post-Bid
$2,000,000 est. value
Hoover, AL 35244

Reported 04/14/2022 12:00 AM
Project Title

2022 Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Birmingham, AL   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $5,300,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the rehabilitation of approximately 82,300 linear feet of 8-inch through 27-inch sanitary sewer pipe with cured-in-place liner, approximately 61 service lateral connection saddles via excavation, 1,311 service lateral launch inspections, 50 service lateral cured-in-place liners, 500 vertical feet of manhole rehabilitation, 14 install new precast concrete manholes, asphalt paving, and restoration work. The excavation portion of this project is classified as a class “a” sewer line project. All prospective bidders must be pre-qualified with the jefferson county environmental services department to either bid class “a” sewer line projects or cured-in-place.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents