Similar Projects
Ayer Street Water Line- City of Barre
Infrastructure
Conception
$510,000 CJ est. value
Barre, VT 05641

Ayer Street Water Line- City of Barre
Infrastructure
Conception
$510,000 CJ est. value
Barre, VT 05641

State Street Sewer and Drainage Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Montpelier, VT 05602

State Street Sewer and Drainage Improvements
Infrastructure
Bidding
$100,000 CJ est. value
Montpelier, VT 05602

Umbrella Contract for Statewide Site and Earthwork Services
Term Contract
Post-Bid
Montpelier, VT

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Site Work Services
Term Contract
Results
$60,000 est. value
Montpelier, VT

Valve Exercising at Public Community Drinking Water Systems
Term Contract
Results
$50,000 est. value

Spruce Place
New Construction - 27,122 SF
Construction
$2,493,540 est. value
Berlin, VT

Yestermorrow Dormitory 1
New Construction - 1,250 SF
Construction
$70,000 est. value
Waitsfield, VT 05673

Brook Street Water Line - City of Barre
Infrastructure
Conception
$240,000 CJ est. value
Barre, VT 05641

Barre City Hes 037-1(8)
Infrastructure
Bidding
$5,000,000 CJ est. value
Barre, VT 05641

Lake Carmi Wastewater Filter Pod Maintenance
Infrastructure
Post-Bid
$35,000 est. value
Montpelier, VT

Retainer Contracts for Statewide Site and Earthwork Services
Term Contract
Results
$150,000 est. value

Hill Street Water Line (Upper) - City of Barre
Infrastructure
Conception
$220,000 CJ est. value
Barre, VT 05641

Last Updated 09/12/2022 01:11 PM
Project Title

Hydrant Density Improvement - City of Barre

Physical Address View project details and contacts
City, State (County) Barre, VT 05641   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Hydrant Density improvement est 200 + hydrants. Project is included in the City of Barre's FY 2023 - 2027 Budget CIP. As of September 12, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated from 2022 to 2032.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents