Similar Projects
Last Updated | 11/14/2019 10:54 AM |
Project Title | Frank Street Park Renovation Project - Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Pittsburgh, PA 15123 (Allegheny County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Consists of rehabilitation work at Frank Street Park including the installation of approximately 200 LF of 12" ADS N-12 storm sewer pipe perforated ADS drain pipe 2x2 concrete inlets 4800 S.F. of asphalt sidewalk 770 S.F. of concrete border and 150 C.Y. of mulch; as well as the site preparation for a playground and swingset (equipment and installation to be performed by the Borough); general grading; site preparation; traffic control; erosion and sedimentation controls; and restoration complete in place. ADD ALTERNATE NO. 1 This project includes additional rehabilitation work at Frank Park including the installation of a new Bocce Court and the installation of a new Horseshoe Court with respective grading and restoration complete in place. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |