Similar Projects
The Piazza at Former Star City Site - Master Plan
New Construction - 51,100 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Bridgeville, PA 15017

3 Crossings Phase 2 - Building B - Office, Retail and Riverfront Plaza
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Pittsburgh, PA 15222

Pittsburgh Penguins Former Arena Site - Entertainment Facility by Live Nation and Parking Garage
New Construction - 40,000 SF
Design
$3,000,000 est. value
Pittsburgh, PA 15219

Lot 10 - North Shore Entertainment Building and Plaza
New Construction
Design
$4,500,000 est. value
Pittsburgh, PA 15212

McCandless Park and Ride Site Improvement Project
Bidding
Pittsburgh, PA

South Park Trail Improvement Project
Post-Bid
South Park Township, PA 15129

Great Allegheny Passage - Waterfront Paving
Renovation
Post-Bid
Homestead, PA 15120

Wightman Park Improvements
Results
Pittsburgh, PA 15219

Frick Park Swings And Surfacing
Results
Less than $54,000 est. value
Homestead, PA

Nova Place
Renovation - 26,000 SF
Construction
$2,700,000 est. value
Pittsburgh, PA 15212

The Stacks at 3 Crossings
New Construction - 128,000 SF
Construction
$16,000,000 est. value
Pittsburgh, PA 15222

Monongahela Riverfront for Recreational Use - Master Plan
New Construction
Conception
Pittsburgh, PA 15207

Frick Park - Phase 2
Renovation
Design
Pittsburgh, PA 15217

Larimer Playground & Village Green
Post-Bid
Pittsburgh, PA 15206

Fairhaven Park Phase II
Results
Less than $120,000 est. value
North Versailles, PA

Last Updated 11/14/2019 10:54 AM
Project Title

Frank Street Park Renovation Project - Phase 2

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15123   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of rehabilitation work at Frank Street Park including the installation of approximately 200 LF of 12" ADS N-12 storm sewer pipe perforated ADS drain pipe 2x2 concrete inlets 4800 S.F. of asphalt sidewalk 770 S.F. of concrete border and 150 C.Y. of mulch; as well as the site preparation for a playground and swingset (equipment and installation to be performed by the Borough); general grading; site preparation; traffic control; erosion and sedimentation controls; and restoration complete in place. ADD ALTERNATE NO. 1 This project includes additional rehabilitation work at Frank Park including the installation of a new Bocce Court and the installation of a new Horseshoe Court with respective grading and restoration complete in place.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents