Similar Projects
Victoria Park A-17 Basin Pump Station Rehabilitation - FY20150212 - City of Fort Lauderdale
Renovation
Conception
$6,318,516 CJ est. value
Fort Lauderdale, FL 33301

Robbins Lodge Equestrian Center Improvements - PW13 - Town of Davie
Infrastructure, Renovation
Conception
$2,400,000 CJ est. value
Davie, FL 33330

Undergrounding of Beach Electrical Services
Infrastructure
Design
$246,489 CJ est. value
Dania Beach, FL 33004

Lift Stations 128 and 210 Rehabilitation
Renovation, Infrastructure
Bidding
$2,158,059 CJ est. value
Sunrise, FL 33351

Lift Station #3 Improvements
Renovation
Bidding
$1,225,000 CJ est. value
Hallandale Beach, FL 33009

Utility Analysis Zone 108
New Construction, Infrastructure
Post-Bid
$21,504,000 est. value
Pompano Beach, FL 33060

D/B - Design Build Flagler Village New Pumping Station A-24
New Construction
Post-Bid
$540,000 est. value
Fort Lauderdale, FL

Sewer Lift Station Rehabilitation and Repair
Term Contract
Results
FL

Replacement of Lift Station - 15
New Construction
Results
Pembroke Park, FL 33023

George T. Lohmeyer Sludge Pump Rehabilitation - FY20221035 - City of Fort Lauderdale
Renovation
Conception
$2,893,132 CJ est. value
Fort Lauderdale, FL 33316

Lift Station #1 - Egret Tri-plex Submersible Lift Station Improvements
Renovation
Bidding
$200,000 CJ est. value
Hallandale Beach, FL 33009

Lift Station Rehabilitation and Repair Services
Renovation
Post-Bid
Sunrise, FL

Sewage Lift Station Rehabilitation At Station Ft. Lauderdale
Renovation
Results
Dania Beach, Fort Lauderdale, FL 33004

River Oaks Pump Station
Infrastructure
Post-Bid
$8,745,000 CJ est. value
Fort Lauderdale, FL 33315

Lift Station No. 3 Replacement Project
Renovation
Results
$790,000 est. value
Plantation, FL 33324

Last Updated 10/17/2022 10:42 AM
Project Title

Lift Station # 2 Rehabilitation

Physical Address View project details and contacts
City, State (County) Hallandale Beach, FL 33009   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,746,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

TSFGeo Proposal No. 7111-22-039 Lift Station # 2 Rehabilitation The intent of the project is to rehabilitate and improve the City s existing Lift Station #2 located at the intersection of Golden Isle Drive and Diana Drive by replacing and upgrading mechanical and electrical equipment as well as replacing the existing emergency generator to improve system performance, increase system efficiency, and reduce system maintenance. This RFP/Project contains Minimum Qualification Requirements (MQRs) that firms must meet in order to respond. Please read the MQRs found in Bid document. Firms have until the deadline below to submit questions. LAST DAY FOR QUESTIONS: Any questions are to be submitted via email to kvohwinkel@cohb.org no later than October 3, 2022 by 11:00 A.M. Answers to questions received will be released via addendum. Each proposer must provide with the submission a Proposal Guarantee/Bond in the form of Bid Bond in the amount of five percent (10%) payable to the City of Hallandale Beach. These funds are not cashed. These funds are retained guaranteeing the firm submitting the proposal will not withdraw the proposal for such period of time as the Commission provides a Resolution for award of contract.PERFORMANCE AND LABOR MATERIALS PAYMENT BOND: Proof of 100% of total contract bonding capacity must be submitted with bid is required. Bidder shall furnish all labor, equipment, and materials to demolish the existing submersible wastewater lift station including pumps, wet well top slab, discharge piping, controls, emergency power station structure, emergency generator system and fuel system as applicable. The existing wet well below the top slab will remain. The project will include, but not be limited to, the rehabilitation of the existing wet well, installation of submersible wastewater pumps and accessories, access hatches, discharge piping, flow meter, gravity sewer, valves, and fittings, macerator assembly, control system, SCADA, electrical service, emergency generator with integral fuel tank, fencing, water service, start-up services, training, site restoration, associated roadway and right-of-way restoration, and all other appurtenances necessary for a complete and accepted project. Construction of this project will require close coordination with the Owner and Engineer.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents