Similar Projects
FSH National Cemetery Road Repair and Restroom Construction
New Construction
Design
$1,000,000 to $5,000,000 est. value
San Antonio, TX

Restroom Replacement at Lake Corpus Christi State Park
New Construction
Bidding
$950,000 to $1,125,000 est. value
Mathis, TX 78368

Jail Shower Renovations
Renovation
Bidding
Bryan, TX

Restroom Renovations
Renovation
Post-Bid
Leggett, TX 77350

Field House Addition and a New Concession/Restroom Building for the Bosqueville ISD
New Construction, Demolition - 2,200 SF
Post-Bid
Less than $950,000 est. value
Waco, TX 76700

Cat Hollow Park and Pool Restroom Renovation
Renovation
Results
Less than $410,000 est. value
Round Rock, TX 78664

Aransas Prefabricated Concrete Restroom
Results
TX

Western Oaks Property - Pool House Addition
Addition - 816 SF
Construction
$900,000 est. value
Austin, TX 78749

San Antonio Country Club - Restroom Pavilion
New Construction - 250 SF
Construction
$90,000 est. value
San Antonio, TX 78209

City of Pflugerville - Lake Pflugerville Park Ph 1
Bidding
Pflugerville, TX 78660

Construct Restroom/Meeting Facility at Sale Park in Downtown Bryan
Post-Bid
Bryan, TX 77803

Maintenance Facilities Relocation of Pool & Bathhouse Complex
Results
$170,000 to $220,000 est. value
Goliad, TX 77963

Lakeview RV Resort Expansion
New Construction - 1,625 SF
Construction
$525,000 est. value
Houston, TX 77045

Eisenhower State Park - Restroom Replacements
Renovation
Bidding
$850,000 to $1,012,500 est. value
Denison, TX 75020

Love's Travel Stop #279 - Restroom Remodel
Renovation - 154 SF
Post-Bid
$160,000 est. value
Mount Vernon, TX 75457

Last Updated 11/06/2019 03:54 PM
Project Title

Removal and Replacement of Bathtubs and Shower Pans SAHA Wide

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78204   (Bexar County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $170,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall remove the access wall panel to be able to get to the plumbing of the bathtub. If Contractor cannot get to the plumbing then he/she will have to remove all shower wall tile. Contractor shall remove existing tub and, if required for tub removal or requested by SAHA, the shower valve, tub spout, drainage, shower head, and over flow. Additional work must be approved by SAHA prior to commencing work. Plumbing work must be performed by a licensed plumber and Contractor shall submit copy of plumbing license with proposal.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents