Similar Projects
Coliseum Medical Centers Freestanding Emergency Department
New Construction, Infrastructure
Conception
$11,928,250 CJ est. value
Bonaire, GA 31005

RFQ - Retention Pond Maintenance at Cohen Walker Drive
Renovation, Infrastructure
Bidding
$150,000 CJ est. value
Warner Robins, GA 31088

Retention Pond Maintenance at Falls Drive
Renovation, Infrastructure
Bidding
$280,000 CJ est. value
Warner Robins, GA 31005

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Perry Fieldhouse Site Improvements
Infrastructure
Post-Bid
GA

Mass Paving
Infrastructure
Results
GA

Mass Paving
Infrastructure
Results
GA

CRH Healthcare Shell Building / Bonaire
New Construction, Infrastructure - 4,000 SF
Construction
$800,000 CJ est. value
Bonaire, GA 31005

Perry-Houston County Airport - City of Perry
Infrastructure
Pending Verification
$2,000,000 CJ est. value
Perry, GA 31069

Bob White Storage Expansion / Perry
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$500,000 CJ est. value
Perry, GA 31069

Water System Improvements Phase II to Serve Gilbert Road
Infrastructure
Post-Bid
$750,000 est. value
GA

Valve and Meter Boxes
Term Contract
Results
Warner Robins, GA

Ashley Drive Multi-Residential Development
New Construction, Infrastructure
Pending Verification
$93,000,000 CJ est. value
Perry, GA 31069

Joint 2022 Local Maintenance and Improvement Grant
Infrastructure
Post-Bid
Byron, Centerville, Perry, Warner Robins, GA

Signing, Pavement Markings Upgrades and Shoulder Rehabilitation on Various County Roads
Infrastructure
Results
GA

Last Updated 05/05/2023 12:07 PM
Project Title

Aquatic Center Site Work

Physical Address View project details and contacts
City, State (County) Warner Robins, GA 31088   (Houston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,660,900 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing all labor and materials required for Aquatic Center Site Work, including but not limited to clearing, erosion control, grading, storm drainage utilities, paving and sidewalks, fencing and landscaping and all other work specified. The site work for the Project will be awarded in one contract. The Aquatic Center Building will be constructed under a separate contract. The Owner will evaluate all proposals received in accordance with the Evaluation Criteria contained in the Request for Proposals and award the contract to the Proposer who Owner deems most advantageous to the Owner Each Proposal must be accompanied by a Bid Bond in the amount of 5% of the Contract Amount indicated in the Proposal, prepared on the form of Bid Bond that is part of the Proposal Documents, duly executed by the Proposer as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570. The successful Proposer for this Contract shall be required to furnish a Performance Bond and Payment Bond, satisfactory to the Owner, each in the amount of 100% of the Contract No land acquisition is required for the project. The anticipated start date is June 1, 2022, and project has an approximate duration of 16 months. The Owner reserves the right to reject any or all Proposals, to waive informalities and technicalities. CONSTRUCTION INCLUDES HOUSTON COUNTY AQUATIC CENTER WITH ASSOCIATED VEHICULAR AND PEDESTRIAN AREAS.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents