Similar Projects
Costco / Guilderland
New Construction, Infrastructure - 158,202 SF
Conception
$20,000,000 CJ est. value
Albany, NY 12203

Costco / Guilderland
New Construction, Infrastructure - 158,202 SF
Conception
$20,000,000 CJ est. value
Albany, NY 12203

AutoZone #4716 / Jamaica
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
New York, NY 11433

AutoZone #4716 / Jamaica
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
New York, NY 11433

RFP D/B - Design-build Services for I-81 Viaduct Project - Phase 1, Contract 1
Infrastructure
Bidding
$300,000,000 CJ est. value
Syracuse, NY 13205

North Academic Center (Cuny) Elevators Modernization
Term Contract, Renovation, Infrastructure
Bidding
$6,800,000 CJ est. value
New York, NY 10031

2021 Capital Project - Phase 2A Environmental (Abatement)
Term Contract, Infrastructure
Sub-Bidding
$80,000 CJ est. value
Niskayuna, NY 12309

Replace Fueling Station at Maintenance Facility
Post-Bid
West Babylon, NY

Village Municipal Building and Barker Pubic Library Basement Package
Infrastructure
Post-Bid
Barker, NY 14012

Renovation of Automated Fuels Service Station
Renovation
Results
$250,000 to $500,000 est. value
Newburgh, NY

Cross-County Sanitary/Kessman Landfill Site
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Patterson, NY 12563

Coco Farms
New Construction, Demolition - 4,200 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Shrub Oak, NY 10588

Repairs and Painting on the Gowanus Viaduct in Brooklyn
Infrastructure
Construction
$167,358,000 CJ est. value
New York, NY 11220

Covenant Gardens
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Hamburg, NY 14075

VanBurenville Road Solar
Infrastructure
Pending Verification
$5,000,000 CJ est. value
Middletown, NY 10940

Last Updated 08/30/2022 10:01 PM
Project Title

EV Fast Charging Station

Physical Address View project details and contacts
City, State (County) Westport, NY 12993   (Essex County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase and Installation of ONE (1) EV Fast Charging Station (Charge Point Express 250 Station or equivalent) with two charging ports. All bids must be made on the official Bid Form or an exact copy by reproduction thereof and enclosed in a sealed envelope. Each contract is a lump sum bid as described in the Instructions to Bidders. No bidder may withdraw his bid within forty-five (45) calendar days after the actual date of the opening thereof. Please contact George Hainer at (518) 962-4419 or email codes@westportny.net for additional information concerning the bidding. Owner reserves the right to reject any and all Bids, to waive any and all informalities and the right to disregard all nonconforming, non-responsive or conditional bids. This project is wholly or partially funded through the Municipal Zero-Emission Vehicle Infrastructure Fund and is administered by the NYS Department of Conservation and awarded to the Town of Westport. Certified Minority and Women-Owned Business Enterprises (M/WBE) and Section 3-eligible contracting firms are encouraged to consider this project. The Town of Westport affirmatively states that in regard to any contract entered into pursuant to these instructions, without regard to race, color, sex, religion, age, national origin, disability, sexual preference or Vietnam Era veteran status, disadvantaged and minority or women-owned business enterprises will be afforded equal opportunity to submit bids in response hereto.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents