Similar Projects
Sunrise Circle Wastewater Connection
Infrastructure
Bidding
$400,000 CJ est. value
Flower Mound, TX 76226

Water Supply Plant - Phase 1 to Serve Brazoria County Municipal Utility District No. 87
Renovation
Bidding
$300,000 CJ est. value
Brazoria, TX 77422

Plumbing Services, Lufkin State Supported Living Center
Term Contract
Sub-Bidding
Pollok, TX 75969

East System Control Valve
Renovation, Infrastructure
Sub-Bidding
$600,000 CJ est. value
Wylie, TX 75098

Two Fountains at Farmers Branch Manske Library
Alteration
Post-Bid
Farmers Branch, TX 75234

Replace 2 Wilkins 2" Double Check Valves
Alteration
Post-Bid
TX

Blanket Purchase Agreement- Plumbing Repairs-Supplies/Services
Results
San Antonio, TX

Blanket Purchase Agreement- Plumbing Repairs-Supplies/Services
Results
San Antonio, TX

Plumbing Supplies District-Wide
Term Contract
Sub-Bidding
Brownsville, TX 78520

Solenoid Valve
Alteration
Post-Bid
San Antonio, TX 78212

Clemens Unit: Replace Structural Floor and Plumbing System - B Building Wings C and D
Results
$2,389,331 est. value
Brazoria, TX 77422

Plumbing, Parts, Supplies and Related Services
Term Contract
Sub-Bidding
Irving, TX 75061

City Hall Front Water Fountain Cleaning, Maintenance, and Repair
Term Contract
Post-Bid
Dallas, TX 75254

General Plumbing Services
Term Contract
Results
$24,000 est. value
Pearland, TX

Phillips Event Center Plumbing
Alteration
Post-Bid
Bryan, TX 77802

Last Updated 11/30/2022 08:32 PM
Project Title

Sienna Mobility Improvements - Sienna Parkway at Harvest Market, Sienna Parkway at McKeever Road

Physical Address View project details and contacts
City, State (County) Rosharon, TX 77459   (Fort Bend County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $451,978 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sienna Mobility Improvements - Sienna Parkway at Harvest Market, Sienna Parkway at McKeever Road. Scope of Work of the Contract includes the following: : Remove and replace existing pavement, drainage improvements, traffic control, signage and striping, traffic signal installation, utility relocation, and landscaping. Attendance by each prospective bidder or its representative at the pre-bid conference is MANDATORY, and no Bid will be opened unless the bidder or representative was present at the pre-bid conference either in person or via teleconference. Each Bid must be accompanied by a Bid Bond or a certified or cashier's check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract and execute the Bonds on the forms provided, and provide the required insurance certificates within seven (7) days after the date Contract Documents are received by the Contractor. If a certified or cashier's check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier's check within twenty-four (24) hours of receipt of the bid opening. A Bidder submitting electronic Bids must submit its Bid and bid securities in compliance with Owner's Order Adopting Section 49.2731 Electronic Bidding Rules and all electronic Bids and bid securities must be submitted through By submitting a Bid, Bidder acknowledges and agrees that the Contract Documents may be accepted, executed or agreed to through the use of an Electronic Signature, as defined by and in accordance with Owner's Electronic Signature Rules for Construction Contracts. The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except time of submitting a Bid. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents