Similar Projects
Hazel Storage Basin CSO 10 and 11
Results
Akron, OH

ADS, Hancor, Haviland and Baughman Name Brand Plastic Tubing, Pipe and Fittings (MBE Vendors Only)
Results

Septic System Abandonment and Tie into Public Sewer 4043 Brookside Court
Results
Less than $6,000 est. value
Norton, OH 44203

Septic System Abandonment and Tie into Public Sewer 3863 Croydon Road
Results
Less than $6,000 est. value
Norton, OH 44203

Septic System Abandonment and Tie into Public Sewer 4025 Brookside Court
Results
Less than $6,000 est. value
Norton, OH 44203

Septic System Abandonment and Tie into Public Sewer 3873 Easton Road
Results
Less than $6,000 est. value
Norton, OH 44203

Septic System Abandonment and Tie into Public Sewer 3751 Valley Drive
Results
Less than $6,000 est. value
Norton, OH 44203

North Main Street/Brandywine Drive Storm Sewer (Cemetery) Project
Results
Hudson, OH

2019 Concrete Slab Replacement and Storm Water Inlet Repairs Project
Results
Less than $485,000 est. value
Fairlawn, OH

2019 Storm Sewer Lining
Results
Hudson, OH

Indian Creek Exposed Sewers Project
Results
Less than $231,996 est. value
OH

Miscellaneous Storm Sewer Projects 2019
Results
$1,359,490 est. value
Silver Lake, Stow, OH 44224

Old School Green, 34 North Oviatt Street
Results
Hudson, OH

Fairway Storm and Sanitary Sewer Improvements
Results
Less than $1,230,802 est. value
Akron, OH 44313

Duane Green Project CSO Rack 3
Term Contract
Results
$5,604,870 est. value
Akron, OH 44308

Last Updated 12/20/2018 04:51 PM
Project Title

Uhler Conveyance CSO Rack 27 and 29

Physical Address View project details and contacts
City, State (County) Akron, OH   (Summit County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,026,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Replacing and enlarging combined sewer on Cuyahoga Street from CSO Rack 29 near Schultz Street to CSO Rack 30, approximately 900 feet north of Peck Road. New separate storm sewer will also be installed in this area. New combined sewer will be constructed near the intersection of Memorial Parkway and Uhler Avenue to reconfigure CSO Rack 27. A new aerial utility. bridge will be constructed to convey flows from CSO Rack 27 across the Little Cuyahoga River to the Little Cuyahoga Interceptor in the Memorial Parkway Trail Head Parking Lot. The CSO Rack 27, 29, and 30 structures will be reconstructed.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents