Similar Projects
Cobblestone Development
New Construction
Conception
Rogers, AR 72758

Admiral East
New Construction - 16,000 SF
Conception
Fayetteville, AR

Hylton Place Phase III
New Construction
Design
Springdale, AR 72764

Whispering Oaks Subdivision
New Construction
Design
Siloam Springs, AR 72761

Pinnacle Heights
New Construction
Bidding
Maumelle, AR

Rehabilitation of a Single Family Owner-Occupied Dwelling
Renovation
Post-Bid
Rogers, AR

Cotton Plant Housing Authority Unit Rehabilitation
Renovation
Post-Bid
Cotton Plant, AR

Claud Road Subdivision
New Construction
Construction
White Hall, AR

Aiden's Place
New Construction
Pending Verification
Fayetteville, AR 72704

Country Club Of Arkansas
New Construction
Pending Verification
Maumelle, AR

Fox Meadow Subdivision
New Construction
Conception
Siloam Springs, AR

Park Meadows - Phase 3
New Construction
Design
Fayetteville, AR 72701

Bathroom Renovations
Renovation
Post-Bid
Ozark, AR

Meadows at Stonebridge
New Construction
Pending Verification
Fayetteville, AR 72701

Devoe Bend
New Construction
Conception
Maumelle, AR 72113

Reported 07/29/2021 12:00 AM
Project Title

Bathroom Renovations at Phillips Plaza - Phase 4

Physical Address View project details and contacts
City, State (County) Springdale, AR 72765   (Washington County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Renovations for 39 Dwelling Units - 1. Remove All Existing Molding/Wainscot Materials. Replace With Moisture Remove All Existing Molding/Wainscot Materials. Replace With Moisture Resistant Gypsum Board, Primed, With (2) Coats Of Selected Paint Color. Color To Be Selected By Owner. 2. Remove All Floor, Floor Base And Shoe Where Present In Bathrooms. Install Remove All Floor, Floor Base And Shoe Where Present In Bathrooms. Install New Floor, Wood Floor Base And Shoe Along Wall Per Schedule. 3. Remove And Replace Tub. Remove Existing Tub Surround. Replace With Remove And Replace Tub. Remove Existing Tub Surround. Replace With Swanstone Panels. See Toilet Accessories Schedule On A-01. Remove And Replace Existing Valves/Drains And Shower Head. Install 1/2" Cement Board Behind Surround. 4. Remove And Replace Existing Shower Rod. Remove And Replace Existing Shower Rod. 5. Windows Need To Remain Intact Through Demolition And Install Of Shower Windows Need To Remain Intact Through Demolition And Install Of Shower Inserts. Windows Will Need To Be Incased Properly To Protect From Any Future Water Damage. 6. Remove And Replace Water Closet Per Schedule. Do Not Cut Water Closet Remove And Replace Water Closet Per Schedule. Do Not Cut Water Closet Bolts With Grinder. Seal To Floor. Ensure Water Closet Is Leveled. 7. Contractor To Remove And Replace All Toilet And Lavatory Shut Off Valves. Contractor To Remove And Replace All Toilet And Lavatory Shut Off Valves. Coordinate With Existing Plumbing. 8. Contractor To Clean All Drain Lines For Sink, Shower, Bathtub, Floor, And Contractor To Clean All Drain Lines For Sink, Shower, Bathtub, Floor, And Toilet Before Installing New Product Or Fixtures. 9. Remove Existing Vanity And Replace With New Vanity Unit With Integral Remove Existing Vanity And Replace With New Vanity Unit With Integral Synthetic Bowl. Modify Existing Rough-In As Required To Fit. 10. Install New 1 1/4" Pvc Drain Lines Under Bath Sinks. Install New 1 1/4" Pvc Drain Lines Under Bath Sinks. 11. Replace All Sink And Toilet Cutoff Valves. Use Quarter Turn Brasscraft Replace All Sink And Toilet Cutoff Valves. Use Quarter Turn Brasscraft Valves. 12. Supply Lines Are To Be Flex Type Stainless Braided. Supply Lines Are To Be Flex Type Stainless Braided. 13. Remove Existing Recessed Medicine Cabinet Repair Opening To Match Existing. Remove Existing Recessed Medicine Cabinet Repair Opening To Match Existing. Center New Recessed Medicine Cabinet Over New Lavatory. 14. Remove And Replace All Bath Accessories. Install New Accessories Per Remove And Replace All Bath Accessories. Install New Accessories Per Schedule. 15. Install New Exhaust Fan/Heat Lamp Combo. Install New Exhaust Fan/Heat Lamp Combo. 16. Finish Wall To Be Textured And Ceiling Painted With Knock-Down Pattern. Finish Wall To Be Textured And Ceiling Painted With Knock-Down Pattern. 17. Remove And Replace Hvac Wall Register Vent. Remove And Replace Hvac Wall Register Vent. 18. Any Existing Asbestos Is To Be Abaited Fully Before Work Is To Commence. A Any Existing Asbestos Is To Be Abaited Fully Before Work Is To Commence. A Letter Of Certification Is To Be Provided To Housing Authority For Record.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Asbestos Remediation.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection.
Division 09 - Finishes.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories, Toilet Accessories.
Division 11 - Equipment.
Division 22 - Plumbing, Plumbing Fixtures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents