Similar Projects
Utilities - US 77
Infrastructure
Conception
$1,000,000 est. value
Noble, OK 73068

Effluent Truck Wash Facility - SA0015 - City of Norman
Infrastructure
Conception
$492,950 est. value
Norman, OK

Utilities - US 60
Infrastructure, Alteration
Design
$963,212 est. value
Bluejacket, OK

Utilities - US 60
Infrastructure
Design
Less than $971,698 est. value
Ponca City, OK 74601

Replacing Water Line in the 300 and 400 Blocks of North Gunter Street
Infrastructure
Bidding
$400,000 est. value
Vinita, OK 74301

Dig and Lay Approximately 2500 Feet of Two Inch Waterline
Infrastructure
Bidding
$400,000 est. value
Stigler, OK

New Splash Pad at the Atoka Sports Complex
New Construction, Infrastructure
Post-Bid
Less than $250,000 est. value
Atoka, OK 74525

Kunkle Valve Replacement
Alteration
Post-Bid
Norman, OK 73019

100-200 Block East Garriott Road Waterline Relocation
Results
Enid, OK

4800-5300 Blocks Venture Road Waterline Improvement
Results
$144,490 est. value
Enid, OK

Utilities - US 81
Infrastructure
Design
Less than $1,030,000 est. value
Dover, OK 73734

Meter Replacement
Infrastructure
Bidding
$200,000 est. value
Ponca City, OK

AMI-AMR Water and Electric Meters
Infrastructure
Post-Bid
Lindsay, OK

1500-2500 Block of North Cleveland Street Waterline Relocation
Results
Enid, OK 73703

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Reported 07/06/2022 12:00 AM
Project Title

Forster Drive Waterline Relocation

Physical Address View project details and contacts
City, State (County) Mustang, OK 73064   (Canadian County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Mustang, Oklahoma. Completed plans call for site work for a water / sewer project. Site Directions: W. Forster Dr. from S. Snyder Dr. to S. Mustang Rd. Base Bid to include but not limited to the installation of 330 linear feet of 6" waterline by trenching and boring.This project consists of furnishing all required materials, supplies, equipment, tools, and plan to perform all necessary labor

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents