Similar Projects
Fuel Farm Improvements - Phase III - General Bid
Bidding
$1,700,000 est. value
Nantucket, MA 02554

Fales School Project Propane Tanks
Bidding
Westborough, MA

Fuel Storage and Day Tank Systems Replacement - Gillis Pump Station, Hayes Pump Station and Lexington Street Pump Station - General Bids
Post-Bid
Less than $1,729,000 est. value
Stoneham, Wakefield, Waltham, MA

Shrewsbury Pump Station Underground Storage Tank Removal Project
Post-Bid
Less than $30,000 est. value
Shrewsbury, MA 01545

Install New Liner on Sodium Hypochlorite Tank
Results
Less than $24,000 est. value
Boston, MA

Underground Storage Tank Removal and Installation of Three Above Ground Storage Tanks - General Bid
Results
Less than $195,000 est. value
Nantucket, MA 02554

Monthly A/B Inspections and Underground Tank Repairs and Services as Needed
Term Contract
Bidding
$150,000 est. value
Boston, MA

Underground Storage Tank Upgrades at the Everett Department of Public Works
Post-Bid
Less than $133,000 est. value
Everett, MA 02149

WPCF Fuel Tank Installation
Results
Less than $15,000 est. value
Montague, MA 01351

Aluminum Chlorohydrate Chemical Feed System at the Raw Water Pump Station
Bidding
$95,000 est. value
Lincoln, MA

Materials for Gas Construction
Post-Bid
Less than $100,000 est. value
Westfield, MA 01085

Gas Construction Contractor Annual Contract
Term Contract
Results
Holyoke, MA 01040

Annual Aviation Fuel Farm Inspections and Maintenance Services
Post-Bid
Less than $130,000 est. value
Nantucket, MA

Important Fuel Reduction, Habitat Management and Access Road Improvements on 318 Acres
Results
Less than $250,000 est. value
Plymouth, MA

Above-Ground Fuel Storage Tank Inspections
Post-Bid
Buzzards Bay, MA 02542

Last Updated 04/30/2021 02:50 PM
Project Title

Fuel Farm Improvements - Phase III - Filed Sub-Bid

Physical Address View project details and contacts
City, State (County) Nantucket, MA 02554   (Nantucket County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The project shall include the demolition and removal of existing fueling skids for 100LL and Jet A fuel, and the subsequent installation of new fueling skids. An existing diesel fire pump and associated piping will be removed and replaced with a new electric fire pump and pipe network as well. Minor other ancillary items related to the construction of these items will be included also.

Details

Division 05 - Metals, Metal Fabrications.
Division 21 - Fire Suppression.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents