Similar Projects
Saratoga Springs Lake Mountain Zone 2 South Pond and Losee Canyon Debris
Bidding
Saratoga Springs, UT

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

500 East 600 South Design
Post-Bid
Salem, UT 84653

Pony Express Trench Repair
Results
Less than $1,000,000 est. value
Eagle Mountain, UT 84005

Utah County Various NRCS Emergency Watershed Protection (EWP) Projects
Results
Provo, UT 84606

Knolls Fire Erosion Mitigation Project Phase 2
Post-Bid
Less than $901,255 est. value
Saratoga Springs, UT 84045

Filters and Diversions Project
Results
Less than $1,002,915 est. value
Pleasant Grove, UT 84062

Traverse Mountain Emergency Watershed Protection
Post-Bid
Lehi, UT 84043

Sixth Water Flow Control Structure Modification
Results
Orem, UT 84097

Drain Cleaning and Related Services
Term Contract
Post-Bid

Spanish Fork MS4
Results
Spanish Fork, UT

Lower School House Springs - Phase II
Post-Bid
Lehi, UT

Provo/Orem MS4
Results
Orem, UT 84058

Construction of the 2021 Provo City Lakeview Parkway Phase 4
Post-Bid
Provo, UT

Spanish Fork Parkway Phase 2 Grading
Term Contract
Results
Spanish Fork, UT 84660

Reported 07/10/2020 12:00 AM
Project Title

The East Bay Golf Course Pond Banks Renewal Project

Physical Address View project details and contacts
City, State (County) Provo, UT 84606   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The East Bay Golf Course currently has several pond banks that are in need of repair. Several have a keystone wall that needs to be removed and disposed of on site. Other areas are in need of regrading and erosion control. 1. Removal and relocation of 65 irrigation heads a. Heads shall be relocated within 5 feet of existing location on same lateral line 2. 7,665 LF of keystone block wall removal to be disposed of on-site 3. 2,548 LF of eroded pond bank edge compaction 4. 3.25 acres of shaping 5. 133,180 SF of Fine Grading and Pond Edge Preparation 6. 80,000 SF of Enkamat 7020 Pond Stabilization 7. 16,320 SF of Ryegrass sod 8. 48,260 SF Hydromulch (Ryegrass seed) 9. 68,600 SF Hydromulch (Mountain Native Blend or Scottish Links Seed) 10. Meostrione Additive to Hydromulch 11. Owner provided Turbidity Curtain (approx. 100 LF) shall be put in place at each work location during demo and earthwork. Erosion control measures (silt fence or straw waddle) shall be in place during grassing. If the area is to be seeded the erosion control shall stay in place until satisfactory germination. If the area is to be sodded erosion control measures can be removed immediately after sodding. 12. Removal and disposal on-site of 5,000 to 8,000 SF of phragmites in two different locations. Haul distance to disposal area between 200 and 1,000 feet away.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents