Similar Projects
2021/22 Collector Street Pavement Improvements - Hoover Avenue - City of Ames
Infrastructure
Conception
$2,000,000 CJ est. value
Ames, IA 50010

Power Plant Building Office Entrance - City of Ames
Renovation, Infrastructure
Conception
$500,000 CJ est. value
Ames, IA 50010

Lime Lagoon Improvements - City of Ames
New Construction, Infrastructure
Design
$1,353,000 CJ est. value
Ames, IA 50010

2025/26 Cyride Facility Improvements - Addition to New/Existing Facility - City of Ames
Addition, New Construction, Infrastructure
Design
$750,000 CJ est. value
Ames, IA 50011

RFP - Ames Industrial Park Development
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Ames, IA 50010

Test Drilling at North River Valley
Infrastructure
Post-Bid
$50,000 est. value
Ames, IA

2021/22 Clear Water Diversion
Infrastructure
Results
$300,000 est. value
Ames, IA

2017/18 Low Point Drainage Improvements - Almond Road
Infrastructure
Results
$500,000 est. value
Ames, IA 50014

Therkildsen Industrial Engineering Building
New Construction, Infrastructure - 42,600 SF
Construction
$54,000,000 CJ est. value
Ames, IA 50010

Ballard Dental
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Huxley, IA 50124

North Dayton Industrial Park
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Ames, IA 50010

2021/22 Storm Water Facility Rehabilitation - City of Ames
Infrastructure
Conception
$150,000 CJ est. value
Ames, IA 50010

Cogeneration System Maintenance - City Of Ames
Renovation, Infrastructure
Design
$1,335,000 CJ est. value
Ames, IA 50010

Concrete Repairs at Athletics Locations
Infrastructure
Post-Bid
$80,000 CJ est. value
Ames, IA 50010

PCC Sidewalk/trail
Infrastructure
Results
$967,666 CJ est. value
Ames, IA 50014

Last Updated 07/20/2023 09:58 AM
Project Title

Clear Creek Bank Stabilization (North of Oakland Street) - City of Ames

Physical Address View project details and contacts
City, State (County) Ames, IA 50014   (Story County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storm/Sewers
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2026
Bids Due View project details and contacts
Estimated Value $630,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This annual program provides for stabilization of areas that have become eroded in streams, channels, swales, gullies, or drainage ways that are part of the storm water system. This program provides a more permanent control of the erosion and will reduce recurring maintenance costs in these areas. The project is included in the city's 2020-2025 Capital Improvement Program (CIP). As of February 16, 2021, the Clear Creek stabilization project north of Oakland Street has been delayed (after coordinating with Parks and Recreation staff) in order to address more urgent needs in the community.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of July 20, 2023, no new information available

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents