Last Updated | 08/26/2020 11:46 AM |
Project Title | Community Development Block Grant Demolition Services |
Physical Address | View project details and contacts |
City, State (County) | Victoria, TX 77901 (Victoria County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Demolition, Hauling |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $20,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1) 304 N. West Street – Scope of Work Demolish the building(s) at the location(s) and shall remove all brush, debris, junk, rubbish, trash and weeds at said location(s), in accordance with the requirements of the bid package, all contract documents, and the following: (a) Unless otherwise specified by the City’s Representative, Contractor shall remove the entirety of all buildings at the address, including all foundation and piers. i. The yellow accessory structure on the property Will Remain on the property and shall not be demolished. (b) Contractor shall: i. cut all sewer lines below the surface of the final, level grade of the lot, ii. cap all sewer lines in a manner that seals said pipes from infiltration of water or other material, iii. Send photographs of the capped sewer ends. Capped sewer ends MUST be photographed prior to being covered with dirt or Contractor will be required to dig up capped sewer end for photograph. (c) Contractor shall not disturb gas meter lines that are within 8 feet of the curb. (d) Contractor shall trim back all above-ground cables, electric lines, and telephone lines to the post to which they are affixed and not leave them hanging. (e) Contractor shall fill, with topsoil, the excavated area caused by the removal of the building. (f) Contractor shall fill the demolition area to blend with the existing grade of the lot. (g) Contractor may trim or remove any trees next to the building(s) to be demolished if necessary to facilitate demolition; however, the Contractor shall protect surrounding grounds, and shade trees not next to the building from unnecessary damage resulting from the demolition work. (h) At the completion of the work, the Contractor shall clean, mow, trim, and leave the lot clear of all debris, weeds, junk, trash, and rubbish. (i) Contractor shall furnish all labor, supervision, machinery, equipment, and materials necessary to complete this project in accordance with the contract documents. 2) 1312 Sycamore Street/204 Charles Street (1 lot with 2 addresses) – Scope of Work (a) Unless otherwise specified by the City’s Representative, Contractor shall remove the entirety of all buildings at the address, including all foundation and piers. There are a total of three (3) structures on this property that are to be demolished. Two (2) houses and one (1) garage/carport. (b) Contractor shall: i. cut all sewer lines below the surface of the final, level grade of the lot, ii. cap all sewer lines in a manner that seals said pipes from infiltration of water or other material, iii. Send photographs of the capped sewer ends. Capped sewer ends MUST be photographed prior to being covered with dirt or Contractor will be required to dig up capped sewer end for photograph. (c) Contractor shall not disturb gas meter lines that are within 8 feet of the curb. (d) Contractor shall trim back all above-ground cables, electric lines, and telephone lines to the post to which they are affixed and not leave them hanging. (e) Contractor shall fill, with topsoil, the excavated area caused by the removal of the building. (f) Contractor shall fill the demolition area to blend with the existing grade of the lot. (g) Contractor may trim or remove any trees next to the building(s) to be demolished if necessary to facilitate demolition; however, the Contractor shall protect surrounding grounds, and shade trees not next to the building from unnecessary damage resulting from the demolition work. (h) At the completion of the work, the Contractor shall clean, mow, trim, and leave the lot clear of all debris, weeds, junk, trash, and rubbish. (i) Contractor shall furnish all labor, supervision, machinery, equipment, and materials necessary to complete this project in accordance with the contract documents. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |