Similar Projects
Sims Bayou Harvey Repairs, Harris County, Texas
Post-Bid
TX

FY2020 Local Drainage Program (LDP) Contract 4
Post-Bid
$2,500,000 est. value
Houston, TX 77000

Exploration Green Detention Facility Phase 3A
Results
Less than $5,520,000 est. value
Clear Lake City, TX 77058

Harvey Disaster Recovery Repairs at the Clear Creek Bayou, Armand Bayou and Sims Bayou Watersheds
Results
Less than $1,195,000 est. value
TX

GPISD Sports Complex Drainage
Post-Bid
Galena Park, TX 77547

Construction of the Water, Sanitary Sewer, and Drainage Facilities to Serve Katy Crossing Section 4
Results
Less than $970,634 est. value
TX

Construction of Westwood Subdivision Maple Leaf Box Culverts and Magnolia Creek Ditch Extension
Post-Bid
Houston, TX

Construction of River Ranch Detention Pond A, B, and C
Results
Houston, TX

2020 Annual Paving and Drainage Improvements
Term Contract
Post-Bid
Pasadena, TX 77506

Jones Creek Slope Rehabilitation
Results
Less than $13,998,075 est. value
Houston, TX

Proposed Clearing, Earth Movement, Construction of Proposed Lake Detention Basin, and Storm Sewer Systems Serving Anderson Lakes Development
Post-Bid
TX

Water, Sanitary and Drainage Facilities in Thorncastle Drive Street Dedication and Reserve
Results
Houston, TX 77253

Drainage Facilities to Serve City Gate Detention Phase 2
Post-Bid
TX

HPW FY 2020 Drainage Rehabilitation (Swat) Work Orders 1
Results
Less than $4,000,000 est. value
Houston, TX

Houston Ship Channel Placement Area 15 Improvements
Post-Bid
$5,000,000 to $10,000,000 est. value
Houston, TX 77002

Last Updated 04/27/2021 09:34 AM
Project Title

Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Amira Section 20 and Cypress Heights Drive Street Dedication Section 4

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents