Similar Projects
CDBG - Neighborhood Revitalization
Alteration
Bidding
Lowell, NC 28098

Crown Coliseum Ceiling Tile Replacement
Post-Bid
Fayetteville, NC 28302

99--Conference Room Wall Displays
Post-Bid
Fort Bragg, NC 28310

Guilford Metro 911 - ADA Upgrades
Results
Greensboro, NC 27403

Install Resurface Bathtubs and Install Bathtub Surrounds in 100 Occupied Public Housing Units
Results
Rockingham, NC 28379

Hurricane Dorian Repairs
Post-Bid
Kinston, NC 28502

Drywall Services
Results
Boone, NC

Tile Re-Glazing Bathrooms SFO Fort Macon
Post-Bid
Atlantic Beach, NC 28512

Albermarle Building Showering Facility
Results
Rocky Mount, NC 27804

Wilson Hall Shower Replacement - - East Winston-Salem State University
Post-Bid
Winston-Salem, NC

Insulation Installation and Repair
Term Contract
Results
Raleigh, NC 27610

6924565 Repair Shower Pans, Ceiling, & Wall Leaks in Various Bldgs
Post-Bid
$250,000 to $500,000 est. value
Cherry Point, NC

General Construction (FAL)
Term Contract
Results
Raleigh, NC 27610

1108 & S90 Interior Repairs
Post-Bid
$100,000 to $250,000 est. value
Camp Lejeune, NC 28547

Seventy-First High School, Ceiling Replacement
Results
Fayetteville, NC 28306

Last Updated 07/08/2021 12:23 PM
Project Title

Minor Renovations to the 2nd and 3rd Floors of the Robert C. Williams Business Center

Physical Address View project details and contacts
City, State (County) Fayetteville, NC 28301   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is for the Minor Renovations to the 2nd & 3rd Floors of the Robert C. Williams Business Center (RCWBC). The “Project” is primarily an interior renovation of the existing 5,737 square foot 2nd floor Suite 201 and the existing 2,103 square foot 3rd floor Suite 306 to include renovated spaces for office occupancy. The interior work includes demolition of existing walls, 2x2 lay-in ceilings, furniture partition systems, and carpet flooring. New interior work includes new minor metal stud with gypsum board wall patching, new and relocated doors/frames, relocated electrical services, new room finishes including carpet and tile flooring, painted walls, and 2x2 lay-in ceiling grid/panels. There is no exterior work in this project.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents