Reported | 02/01/2022 12:00 AM |
Project Title | Deep Injection Wells No. 3 and No. 4 Pump Station |
Physical Address | View project details and contacts |
City, State (County) | Hollywood, FL 33019 (Broward County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $83,400,000 |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work to be performed under this Contract shall consist of the construction of a new Injection Well Pump Station, a new Injection Well Electrical Service Center building, and associated site improvements to support the new facilities. The project is divided into two phases of work with an interim milestone established for Phase I. Phase I work includes the following: 1. Injection Well (IW) 3 and IW-4 and Surge Tanks piping connections including control valves and flow meters including structural pads around Injection well and above grade piping and equipment. 2. Electrical and I&C components to temporary connect IW-3 and IW-4 control valves and flow meters into the existing injection well pump station systems. 3. Yard piping and valve vaults to connect the existing injection well pump station to the IW-3 and IW-4. 4. Temporary piping to extend the WTP concentrate force main to the effluent box for clarifier 1 to 4. 5. IW 3 and 4 startup and one year conditioning period. 6. Monitoring Well (MW) 2 sampling pumps and associated piping, valves, fittings and structural pad. 7. Rehabilitation of IW-1 and IW-2 brushing the inside wall of the final casing and acidization of both IWs. This work shall be performed during the startup / testing of IW- 3 and IW-4 Phase II work includes the following: 1. Civil site work including yard piping required for the IW-3 and IW-4 Pump Station and associated site improvements to support new facilities. 2. New retention walls based on a performance specification provided as part of this package. 3. New IW-3 and IW-4 Pump Station No 2 building with integrated wet well. 4. Concentrate transfer system, with integrated wet well, to IW-3 and IW-4 to be housed in the same building as the IW-3 and IW-4 Pump Station. 5. Electrical work including power and I&C work required for the IW-3 and IW-4 Pump Station. 6. New Injection Well Electrical Service Center building with standby electrical power generation for IW-3 and IW-4 Pump Station 7. New Plant Drain Pump Station including all appurtenances 8. Surge Control Tanks Pad 9. Fuel Storage Tanks Pad 10. Strainer Equipment Pad 11. Actuated valve addition at the Water Treatment Plant on the WTP Concentrate Injection Well Pumping system. 12. Connection of the generators to the North Electric Service Center (NESC) 13. Integration of the new facilities into the existing plant SCADA system. 14. FPL power extension 15. Project permitting including Air Permitting |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |