Similar Projects
Raw Water Well #9
Results
Hallandale, FL 33009

Reclaimed Water Treatment Plant (RWTP) - Piping Modification and Production Improvements
Results
Pompano Beach, FL 33062

Mechanical Integrity Testing and Repairs Services for Deep Wells
Term Contract
Results
Sunrise, FL 33351

Mechanical Integrity Testing of the Wastewater Treatment Plant Injection Wells
Results
Less than $120,000 est. value
Pembroke Pines, FL 33027

SBDD Rebuilding of Stormwater Pumps
Results
Southwest Ranches, FL 33331

Fiveash Water Treatment Plant Backwash Pump Conversion
Results
Less than $5,000 est. value
Fort Lauderdale, FL

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
FL

Regional Wastewater Treatment Plant Injection Well Mechanical Integrity Testing
Results
Plantation, FL

GTL Deepwell Electric Power Instrumentation and Control
Results
Fort Lauderdale, FL

Flygt Pumps Replacement/Repair Services
Results
Miramar, FL

By-Pass Pumps Maintenance
Results
Davie, FL

Backwash Pump Replacement at 2A Water Treatment Plant
Results
Pompano Beach, FL 33064

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
$164,450 est. value
FL

Well Water Pump and Motor Combination
Infrastructure
Results
Miramar, FL 33027

Transfer Pump Removal, Repair and Reinstallation
Alteration
Results
$19,989 est. value
Parkland, FL

Reported 02/01/2022 12:00 AM
Project Title

Deep Injection Wells No. 3 and No. 4 Pump Station

Physical Address View project details and contacts
City, State (County) Hollywood, FL 33019   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $83,400,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this Contract shall consist of the construction of a new Injection Well Pump Station, a new Injection Well Electrical Service Center building, and associated site improvements to support the new facilities. The project is divided into two phases of work with an interim milestone established for Phase I. Phase I work includes the following: 1. Injection Well (IW) 3 and IW-4 and Surge Tanks piping connections including control valves and flow meters including structural pads around Injection well and above grade piping and equipment. 2. Electrical and I&C components to temporary connect IW-3 and IW-4 control valves and flow meters into the existing injection well pump station systems. 3. Yard piping and valve vaults to connect the existing injection well pump station to the IW-3 and IW-4. 4. Temporary piping to extend the WTP concentrate force main to the effluent box for clarifier 1 to 4. 5. IW 3 and 4 startup and one year conditioning period. 6. Monitoring Well (MW) 2 sampling pumps and associated piping, valves, fittings and structural pad. 7. Rehabilitation of IW-1 and IW-2 brushing the inside wall of the final casing and acidization of both IWs. This work shall be performed during the startup / testing of IW- 3 and IW-4 Phase II work includes the following: 1. Civil site work including yard piping required for the IW-3 and IW-4 Pump Station and associated site improvements to support new facilities. 2. New retention walls based on a performance specification provided as part of this package. 3. New IW-3 and IW-4 Pump Station No 2 building with integrated wet well. 4. Concentrate transfer system, with integrated wet well, to IW-3 and IW-4 to be housed in the same building as the IW-3 and IW-4 Pump Station. 5. Electrical work including power and I&C work required for the IW-3 and IW-4 Pump Station. 6. New Injection Well Electrical Service Center building with standby electrical power generation for IW-3 and IW-4 Pump Station 7. New Plant Drain Pump Station including all appurtenances 8. Surge Control Tanks Pad 9. Fuel Storage Tanks Pad 10. Strainer Equipment Pad 11. Actuated valve addition at the Water Treatment Plant on the WTP Concentrate Injection Well Pumping system. 12. Connection of the generators to the North Electric Service Center (NESC) 13. Integration of the new facilities into the existing plant SCADA system. 14. FPL power extension 15. Project permitting including Air Permitting

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents