Similar Projects
Parker Downtown Circulation Improvements
Infrastructure
Bidding
Parker, CO

2021 Miscellaneous Concrete Replacement Project
Infrastructure
Bidding
Castle Rock, CO

Wrong Way Driving Traffic Control Enhancement Phase 1 Consisting of Signing, Signal Headupgrades and Pavement Markings
Post-Bid
$1,000,000 to $5,000,000 est. value

Sterling Ranch - Filing 3 Traffic Signal Improvements
Post-Bid
Highlands Ranch, CO

Jamaica Street and Meridian Boulevard Intersection Improvements
Results
Less than $3,581,615 est. value
Castle Rock, CO 80104

2020 Meadows Boulevard and Prairie Hawk Drive Reconstruction Project
Results
Less than $3,152,271 est. value
Castle Rock, CO 80109

East-West Regional Trail, Havana Street to Chambers Road
Post-Bid
Castle Rock, CO 80104

2020 Curb, Gutter and Sidewalk Replacement Project
Results
Castle Rock, CO 80109

Traffic Signal Installation Meadows Boulevard / Cherokee Drive and Highway 85 and Ligget
Post-Bid
Castle Rock, CO 80109

2020 Town Facility Parking Lot Improvement Project
Results
$1,866,286 est. value
Castle Rock, CO 80109

Adaptive Traffic Signal Sys
Post-Bid
Castle Rock, CO 80104

2020 Full Depth Reclamation Project
Results
Less than $659,911 est. value
Castle Rock, CO 80109

Elevated Pedestrian Walkways Repairs
Post-Bid
Littleton, CO 80126

Rectangular Rapid Flashing Beacon (Rrfb) Pedestrian Crossing Installation
Results
$100,000 to $150,000 est. value
Castle Rock, CO

Police Department Parking Lot Improvement Project
Infrastructure
Post-Bid
Castle Rock, CO 80104

Last Updated 08/03/2021 11:41 AM
Project Title

South Yosemite and County Line Road Signal and Curb Ramp Replacement

Physical Address View project details and contacts
City, State (County) Lone Tree, CO   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contract provides for the installation of traffic signals, ADA Curb Ramps, sidewalks and, curb and gutter, at the intersection of East County line Road and South Yosemite Street. The City will be providing the signal poles and mast arms for this project which are anticipated to arrive in July of 2021. Due to the time required to obtain this equipment, this project is anticipated to be constructed starting in the Summer of 2021.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents