Similar Projects
CDBG - Neighborhood Revitalization
Alteration
Bidding
Lowell, NC 28098

Purchase and Install Markawall Magwall II Wallcovering
Alteration
Bidding
Raleigh, NC 27695

Dreams Ceiling Repairs
Post-Bid
Wilmington, NC

SFO Fort Macon- UPH Tile Re-Glazing
Post-Bid
Atlantic Beach, NC

Memorial Auditorium Fire Curtain Replacement
Results
Raleigh, NC 27601

Guilford Metro 911 - ADA Upgrades
Results
Greensboro, NC 27403

Minor Renovations to the 2nd and 3rd Floors of the Robert C. Williams Business Center
Renovation
Bidding
Fayetteville, NC 28301

99--Conference Room Wall Displays
Post-Bid
Fort Bragg, NC 28310

MWBE Contractors for Various Projects
Results
Kinston, NC

Acoustic Ceiling Tiles
Alteration
Bidding
Jacksonville, NC

Hurricane Dorian Repairs
Post-Bid
Kinston, NC 28502

Install Resurface Bathtubs and Install Bathtub Surrounds in 100 Occupied Public Housing Units
Results
Rockingham, NC 28379

Tile Re-Glazing Bathrooms SFO Fort Macon
Post-Bid
Atlantic Beach, NC 28512

Drywall Services
Results
Boone, NC

1108 & S90 Interior Repairs
Post-Bid
$100,000 to $250,000 est. value
Camp Lejeune, NC 28547

Reported 06/03/2021 12:00 AM
Project Title

Community Services Building Renovation Cubicles

Physical Address View project details and contacts
City, State (County) Southern Pines, NC   (Moore County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work will consist of supplying eight (8) cubicles and installation of the cubicles in the Open Office Area 110. The structural panels are to be fabric covered with a painted top cap, 14-gauge steel hanger frames, cable management side cover, and adjustable glides. The top cap is either molded plastic or 25 gauge cold rolled steel. The panel core shall be corrugated, honeycombed paperboard. The frame shall be a top rail and bottom rail and stiles (uprights) of 2” timber strand. Electrical components are to be UL listed. Each set of four (4) cubicles will have a dedicated outlet to plug the pigtail into. Bided furniture should be of equal or greater quality to above description and shall be on the NC Statewide Term Contract 420A-Furniture. Dimensions and a proposed bill of material can be found herein. All proposals shall be itemized so that components may be deleted and include a color chart.

Details

Division 09 - Finishes.
Division 12 - Furnishings, Furniture, Office Furniture, Filing Cabinets.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents