Similar Projects
Last Updated | 06/13/2023 06:34 AM |
Project Title | Midlothian School District 143 Addition and Renovation at: Springfield Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Midlothian, IL 60445 (Cook County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected August 2023 |
Bids Due | View project details and contacts |
Estimated Value | $14,580,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. Work covered by Contract Documents: As defined in the Contract Documents. B. Definitions. The following terms are used throughout the Contract Documents. The work will be governed in accord with the definitions. 1. Fabricated: Fabricated pertains to items specifically assembled or made of selected materials or components to meet individual design requirements. 2. Manufactured: Manufactured means standard units, usually mass produced by an established manufacturer of the respective item. 3. Provide: Provide means furnish and install. 4. Shop fabricated or shop made: Shop fabricated, or shop made refers to items made by a Contractor or Subcontractor in their own Shop. C. Insurance 1. Refer to the attached A101-Exhibit A Insurance and Bonds, as well as A201 General Conditions, for the Designated Purchaser of the following: a. Builders Risk Insurance b. Per occurrence deductible amounts as required by the Owner's insurance. the Addition and Renovation at: Springfield Elementary School. C. Anticipated Award of Contract date: June 14, 2023 D. Anticipated Start of Construction: August 12, 2023 E. Anticipated Substantial Completion date: January 30, 2025 Bid security in the form of a bid bond, certified check or cash in an amount equal to 10 percent of the base bid amount shall be submitted with the bid. Should a bid bond be submitted, the bid bond shall be payable to the Board of Education, Midlothian School District 143 Question Deadline 06/06/2023 at 3:00 PM CT |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |