Similar Projects
Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

Chapel Hill Connector - Perche Creek Trail - 00745 - 1949 - City of Columbia
Infrastructure
Conception
$500,000 CJ est. value
Columbia, MO 65203

5th Street & Life Science Center Tunnels Water Main Replacement
Infrastructure
Design
$29,626,148 est. value
Columbia, MO

General Site East Campus Utility Improvements
Infrastructure
Design
Columbia, MO

Rock Bridge Park Improvement
New Construction
Post-Bid
Columbia, MO

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Resurfacing of a Tennis Court and for the Conversion Of Tennis Courts into Pickleball Courts
Results
Columbia, MO 65202

Playground Safety Tiles
Term Contract
Results

Pedestrian Crossing Downtown
New Construction, Infrastructure
Pending Verification
$278,000 est. value
Columbia, MO

Discovery Park Subdivision
New Construction
Pending Verification
Columbia, MO

Extend Hinkson Creek Substation Feeders - E0193 - 1837 - City of Columbia
Infrastructure
Conception
$10,000,000 CJ est. value
Columbia, MO 65203

Park Shelter for More's Lake at the City of Columbia Municipal Power Plant
Infrastructure
Design
$100,000 CJ est. value
Columbia, MO 65201

Rock Bridge Park Playground Improvements
Renovation
Post-Bid
$55,000 est. value
Columbia, MO 65203

Resurface North and South Parking Lots at 1601 Old Highway 63 South
Infrastructure
Results
Columbia, MO 65201

RFQ Design - Professional Architectural and Engineering Design Consulting Services
New Construction, Infrastructure
Pending Verification
$67,000,000 CJ est. value
Columbia, MO 65203

Last Updated 11/15/2022 05:35 AM
Project Title

Northeast Regional Park Development - 1827 - City of Columbia

Physical Address View project details and contacts
City, State (County) Columbia, MO 65202   (Boone County)
Category(s) Entertainment/Recreation, Heavy and Highway, Sewer and Water
Sub-Category(s) Misc. Recreational, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $3,775,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Development of the former fairgrounds property including synthetic turf multi-purpose sports fields, indoor building improvements, construction of an 8- lane track with synthetic multipurpose field and 4 practice baseball fields. Project will also include utility upgrades, parking lot improvements and LED lighting upgrades. As of November 15, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents